RR75i v2
•
For every cables we recommend to bind the bunch according to the following picture,
we recommend for this use:
–
Length of the bunch (combination of power supply and data cables) can be max-
imum 1,5 m. If the length of data cables exceeds 1,5 m or in the event of, the
cable leads towards the switch – board. We recommend installing over – voltage
protectors (surge suppressors).
–
With data cables they mustn’t carry cables with reticular tension
∼
230 V/50 Hz.
–
All signals to sensors must be twisted pairs.
Figure 11: Cable routing
Figure 12: Cable routing for SL version
•
Sufficient space must be left before individual connectors for handling of cables,
Figure 13: Space in front of connectors
Figure 14: Space in front of connectors – SL
•
For correct function of the router we recommend to use in the switch-board earth-
bonding distribution frame for grounding of power supply of router, data cables and
antenna.
11
12-02-21
LUCOM GmbH — Flößaustr. 22a — 90763 Fürth — Tel.: +49 911/ 957 606 00 — E-Mail: [email protected] — www.lucom.de
www
.lucom.de