![Advantech ITA-2230S Скачать руководство пользователя страница 4](http://html1.mh-extra.com/html/advantech/ita-2230s/ita-2230s_startup-manual_2857440004.webp)
4 ITA-2230S Startup Manual
Power Connector Definition
The IPC has a 3-channel Terminal Block power input con-
nector which provides AC 100~240V or 110V DC voltage to
the board. The definition is as below:
Phoenix Connector DC-in:
Pin Definition:
Pin1
GND
Pin2
N
Pin3
L
AC/DC Power Input Connector
Ethernet LED Definition
The system has 2 RJ45 connectors with LEDs showing
network status.
LAN1~LAN2:
LED Status:
1000M
Green (top left LED)
100M
Orange (top left LED)
10M
No lights
Connection
Green flickering (top right LED)
RJ45 Connector
Indicator LED Color Definition
The system has 3 indicator LEDs at bottom left,with LEDs
showing network status.
LED Color Status
Storage device LED
Orange
Power LED
Green
Warning LED
Red
The system has 3 indicator LEDs at right ahead,with LEDs
showing network status.
LED Color Status
Storage device LED
Orange
Power LED
Green
Warning LED
Red
COM LED Definition
The system has 2 COM connectors with LEDs showing
network status.
COM1~2:
LED Status:
TX Active
Green
TX No Data
No light
RX Active
Orange
RX No Data
No light
1. Open ITA-2230S system chassis cover.
2. Following Pic shown below to insert ITAM Module.
a. Then fix the module front part into c hassis front panel.
b. Check whether the interface of ITAM Module is paral-
lel with ITAM slot on the backplane.
c. Check whether the rivet of the module is fully inserted
in.
3. Fix ITAM Module upon ITA-2230S system with screws
in front and rear both side.
Jumpers and Connectors (Cont.)
Safety Precaution - Static Electricity
ITAM Installation Instructions