EPD-023 User Manual
8
2.3
System Network Specification
Physical transmission data rate 250 Kbps
Network join performance
a.1 pcs EPD device join network in 6 secs.
b.400 pcs EPD device join network in 30 minutes by 1 host WISE-1840 on
WISE-3610Z
Data transfer Performance from Gateway
–
Update 400pcs EPD-023 in 1 hours
–
2 way communication
–
Communication with encrypted AES128
2.4
EPD System-Initial Flow in Device side
This section will explain how the end device to join, register and communicate with
the gateway and router. User may know and understand what performance can be
reach in our specification. Indeed, user may change some parameter to fit their user
scenario.
2.4.1
Tag Scan for Router
Initial scan:
EPD device scan each available channel. If EPD device still can’t
find the router after 2 mins, it will change the status to “lost connect”.
Reconfirm scan:
The EPD device will start scan channel to look for another
router every 2 mins. If EPD device still can’t find the router after 5 times, it will
change Scan channel frequency from 2, 4, 8, 16, 32, 64, 64, 64, 64……mins.
And then the device will move to deep sleep mode after scanning for 5 days.
Stop scan and deep sleep:
If EPD device still can’t find the router finally, it will
stop RF Scanning and back to deep sleep until the button of the Tag has been
pressed. Then tag will start the scanning from the beginning.
Note!
The performance will be adjusted according the environmental limita-
tion.
Ini
Ɵ
al Scan
1-Recon
Įƌ
m
scan
2-Recon
Įƌ
m
scan
Stop scanning
Содержание EPD Series
Страница 1: ...User Manual EPD Device EPD 023 System Solution Wireless ePaper Display Solution ...
Страница 11: ...Chapter 1 1 Product Overview ...
Страница 14: ...EPD 023 User Manual 4 ...
Страница 15: ...Chapter 2 2 EPD 023 Network Specification ...
Страница 21: ...Chapter 3 3 Hardware Specification ...
Страница 25: ...Chapter 4 4 EPD 023 in ePaper Manager ...
Страница 28: ...EPD 023 User Manual 18 ...
Страница 33: ...23 EPD 023 User Manual Chapter 4 EPD 023 in ePaper Manager Please allow to access the installation of erl exe ...
Страница 35: ...25 EPD 023 User Manual Chapter 4 EPD 023 in ePaper Manager ...
Страница 37: ...27 EPD 023 User Manual Chapter 4 EPD 023 in ePaper Manager ...
Страница 48: ...EPD 023 User Manual 38 3 Add Gateway Router to Group ...
Страница 60: ...EPD 023 User Manual 50 ...
Страница 74: ...EPD 023 User Manual 64 4 Binding template ...
Страница 80: ...EPD 023 User Manual 70 3 Clear operation system events 1 Open the Clear Operation System Events section ...
Страница 85: ...75 EPD 023 User Manual Chapter 4 EPD 023 in ePaper Manager ...
Страница 94: ...EPD 023 User Manual 84 Action Bind Template User can manual binding TEMPLATE to EPD device ...
Страница 106: ...EPD 023 User Manual 96 Document User manual Restful API Release Notes ...
Страница 107: ...Chapter 5 5 WISE EC EPD Design in Service ...
Страница 115: ...105 EPD 023 User Manual Chapter 5 WISE EC EPD Design in Service ...