14
2
OVERVIEW OF IMPORTANT OPERATING ELEMENTS
NOTICE: Property damage
Users of the DLT-V72 must be trained by skilled personnel and instructed about the
operation of the device.
2.1
Rear side DLT-V72
Antenna:
−
Do not cover
−
Must have a distance of
> 20 to 50 cm to persons
4 VESA drill holes
−
75 x 75 mm spacing
−
Cooling fins in between
Pressure compensation element:
−
Do not modify or remove
Cable cover
Drilled holes M6 for mounting brackets and accessory holders
(2 on the left side and 2 on the right side of the device)
Battery pocket
Speaker (underneath the device)
Содержание DLoG DLT-V72 Series
Страница 88: ...84 7 2 操作步骤 连接电缆 密封电缆通道 第 1 步 插入橡胶密封件 将橡胶密封件嵌入电缆舱框架 如图 将橡胶密封件的堵头压入框架的孔内 ...
Страница 97: ......