AMT-70/AMT-73/AMT-75 Installation and Operation
CHAPTER 10
BUC AND ADVANTECH SSPB
The purpose of this chapter is to provide the procedures for operating the AMT-70 satellite modem
with the AdvantechAMT BUC and the AdvantechAMT SSPB. P
10.1
SSPB (BUC) Interface Connections
1. Connect BUC WR75 waveguide output to a suitable load. The Ortho Mode Transducer
(OMT) properly mounted to antenna or power attenuator will qualify as a suitable load.
2. Set the BUC power OFF using the command
BUCPOWER OFF
.
3. Connect AMT-70 (J6) to BUC (IFL) using low-loss 50-Ohm cable with type N (male)
connectors at each end. The cable loss must not exceed 12.5 dB at 2000 MHz. Cable
centre conductor DC resistance (end to end) must not exceed 0.5
Ω
. For cable runs up to
100 meters, useLMR-600 or equivalent.
4. Connect AMT-70 (J5) to BUC (RS-485) using twisted pair cable.The connector supplied
with the AdvantechAMT SSPB is used at one end and a 9-pin male D connector at the
other.
Connect M&C RS-232 (P8) interface to a PC with available RS-232 interface.
10.2
LNB Interface Connections
1. Connect LNB WR75 waveguide input to OMT output.
2. Set the LNB power OFF using the command
LNBPOWER OFF
.
3. Connect LNB output to AMT-70 (J1) using low-loss 75-Ohm cable with type F (male)
connectors at each end. Cable loss must not exceed 25 dB at 2150 MHz.
10.3
RS-232 M&C Interface Connections
10.4
AMT-70 Modem Configuration
1. Refer to AMT-70 manual regarding the setting of the modulator parameters.
2. Use the following formula to determine the modulator IF frequency based from upon the
transmit frequency:
(BUC TX frequency) - (BUC LO 13.05 GHz) = Modulator IF carrier frequency.
Example for the desired TX frequency of 14.250 GHz:
14.250 - 13.050 = 1200 MHz.
3. Refer to AMT-70 manual regarding the setting of demodulator parameters.
120
4. Use the following formula to determine demodulator IF frequency based upon the receive
frequency from the satellite: RX frequency – LNB LO frequency = IF
Содержание AMT-70
Страница 34: ...AMT 70 AMT 73 AMT 75 Installation and Operation 34 This page has been left intentionally blank...
Страница 35: ...AMT 70 AMT 73 AMT 75 Installation and Operation 35 This page has been left intentionally blank...
Страница 36: ...AMT 70 AMT 73 AMT 75 Installation and Operation 36 This page has been left intentionally blank...
Страница 148: ...AMT 70 AMT 73 AMT 75 Installation and Operation 148 Figure 76 QPSK at 256kbps at 104dBm Hz Input Power...
Страница 149: ...AMT 70 AMT 73 AMT 75 Installation and Operation Figure 77 QPSK 3MBps at 104dBm Hz Input Power 149...
Страница 150: ...AMT 70 AMT 73 AMT 75 Installation and Operation 150 Figure 78 QPSK at 10Mbps at 104dBm Hz Input Power...
Страница 151: ...AMT 70 AMT 73 AMT 75 Installation and Operation Figure 79 QPSK at 35Mbps at 104dBm Hz Input Power 151...
Страница 152: ...AMT 70 AMT 73 AMT 75 Installation and Operation 152 Figure 80 8PSK at 150kbps at 104dBm Hz Input Power...
Страница 153: ...AMT 70 AMT 73 AMT 75 Installation and Operation Figure 81 8PSK at 400kbps at 104dBm Hz Input Power 153...
Страница 154: ...AMT 70 AMT 73 AMT 75 Installation and Operation Figure 82 8PSK at 16Mbps at 104dBm Hz Input Power 154...
Страница 155: ...AMT 70 AMT 73 AMT 75 Installation and Operation Figure 83 8PSK at 55Mbps at 104dBm Hz Input Power 155...
Страница 156: ...AMT 70 AMT 73 AMT 75 Installation and Operation 156 Figure 84 16QAM at 512kbps at 104dBm Hz Input Power...
Страница 157: ...AMT 70 AMT 73 AMT 75 Installation and Operation Figure 85 16QAM at 6Mbps at 104dBm Hz Input Power 157...
Страница 158: ...AMT 70 AMT 73 AMT 75 Installation and Operation 158 Figure 86 16QAM at 20Mbps at 104dBm Hz Input Power...
Страница 159: ...AMT 70 AMT 73 AMT 75 Installation and Operation Figure 87 16QAM at 70Mbps at 104dBm Hz Input Power 159...