SSPB-Ci60
2. Verify that AC power source is switched OFF.
3. Verify that the AC power source can satisfy the power requirements as given by
at
page 18.
WARNING:
Proper grounding of the AC power outlet is necessary for personnel and
equipment safety. Improper grounding may cause serious injury or death of the operator.
CAUTION:
Ensure that the proper pin is selected for AC operation. Applying power on
the wrong pin may permanently damage the AWMT unit necessitating factory repair. Refer
to
TABLE 10
at page 27 for the correct pin assignment.
4. Using the AC power cable fabricated per
Section 6.3.1
, connect one end of the power cable
to port (J5) of the SSPB Block Up-Converter.
5. Connect the remaining end of the cable to the AC power source.
TABLE 10
: AC LINE (J5) CONNECTOR – PIN ASSIGNMENTS
Description
Pin
Phase (live)
A
Ground B
Neutral C
6. If necessary, connect a power meter or a spectrum analyzer to the RF output monitor port
(Mon).
27
Содержание SSPB-Ci60
Страница 16: ...SSPB Ci60 Figure 1 Product Outline 15 ...
Страница 33: ...SSPB Ci60 Figure 4 VT RS 232 Communication Terminal Mode Display after pressing ENTER 32 ...
Страница 36: ...SSPB Ci60 Figure 5 VT RS 232 Communication List of commands after pressing h for Help 35 ...
Страница 48: ...SSPB Ci60 Figure 6 Proposed Graphic User Interface GUI based on RS 485 Protocol 47 ...