background image

Page 9 of 16 

 

 

 
 
 
 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Initial start-up: 
 

Clean out the Sump:  

Remove any foreign 

material in the sump before start up.  It is normal 
for some debris to accumulate in the sump.  It is 
best to flush out the sump with water to clear any 
debris. 

 

Filling the unit with water: 

Once  the  unit 

has  been  hooked  up  to  a  water  source,  turn  the 
water  supply  valve  on  and  the  unit  will  fill  with 
water.  The float valve will shut off the water flow 
when the reservoir is filled.

 

 
 

  START-UP PROCEDURE 

Do not operate the pump when the reservoir is dry.  This will cause the pump to 
fail and also void the warranty.   

   

 

There are 4 factors to consider when determining where to place your evaporative cooler. 
 

1. 

Fresh air supply:

  

The inlet side of the unit (pad side) requires a constant, uninterrupted supply of fresh air for 

maximum performance.  A distance of 3 ft. of clear space is recommended. 

 

2. 

Discharge  airflow:

   

The  cool  air  discharged  from  the  unit  should  be  free  of  obstruction  to  allow  the  air  to 

circulate in order to maximize the cooling zone. 

 

3. 

Ventilation:

 

Allow cooled air to circulate away from discharge area of cooler.  This ensures that the unit does 

not re-circulate air that has already been through the evaporative cooling process. 

 

4. 

Placement:

 The unit must be placed on a level surface to operate correctly.  The units create an oval shaped 

air pattern that can reach out as far as 20 feet.  Obstacles such as racks and workbenches may interfere with 
the cooling zone.  An attempt should be made to locate the unit in such a manner that interruption of the air 
pattern is held to a minimum.  Multiple units may be required to cover large areas. 

 

 

 

 

 
 

 

 
 

 

ELECTRICAL SHOCK HAZARD 

 

 

Serious injury or death may 
occur. 

 

 

Disconnect from electrical 
supply before servicing this 
product

Annual start-up:  

At the beginning of each cooling season follow the same procedures as the initial start-up with some possible 
exceptions.  If the media was removed for the winter, it will have to be replaced (note instructions below on media 
replacement).  Check the condition of the media.  If the flutes of the media are clogged with buildup of alkali deposits or 
are otherwise damaged, consider replacing the media.  This is the best time to make this decision while the unit is not 
being used and may not be as critically needed. 

 

 
 
 

Starting the pump: 

Allow the reservoir to fill before turning the pump on.   Once the reservoir is full, the 

pump switch may be turned to the ‘ON’ position. 

 

 

Initial Washing of the Cooling Media

:  

The media should be washed for several hours by running 

the pump without any airflow through the media.  This washing action will clean out any debris in the media 
as well as 

reduce any odor and improve wetting ability

 

Break in Period for Cooling Media: 

The media will reach its peak operating condition after about 

100 hours of operation.  The chemical constituency rigidifying agents in the media will then be set and will 
not leach out further.  Ignore any coloration in the water during this initial period. 

 

If a strong odor persists, run the pump to flush the media with water, without airflow through the media, until 
the odor disappears.

 

 
 

Содержание Cool-Space CSW-12-VD

Страница 1: ...ble Read understand and follow all safety information and instructions in this manual before using or servicing this product Retain these instructions for future reference CSW 12 VD Portable Evaporative Cooler A Product of Advanced Radiant Systems Inc www cool space com sales cool space com ...

Страница 2: ......

Страница 3: ...ure Page 9 Maintenance Pages 10 11 Troubleshooting Page 12 Replacement Parts Page 13 Warranty Page 14 ATTENTION The table to the right provides definitions of the signal words that can be found throughout this manual These signal words are used to express the severity of the hazard at hand The signal words are generally used in conjunction with safety symbols that correspond to the text for that p...

Страница 4: ...al blower design Easy to operate and maintain plus an economical solution for low cost spot cooling Cooling media pad contains a paper treated CELdek material with a rigid protective edge coating Munters MI T edg to extend the life of the pad plus provide added weather and algae protection durability and formulated to withstand repeated cleaning without damage to the pad Ready to plug into any 120...

Страница 5: ...urbulent mixing of air water for optimum cooling and enhanced self cleaning Cooling Media Size 18 x 18 and 4 thick Water Reservoir Capacity 10 gallons Switch Variable Cord 17 long 18 ga 3 conductor cord GFCI Protective Guard CSW 12VD Oscillating Power Supply 120 VAC 60 Hz 3 Amps Unit Dimensions 21 1 4 wide x 27 1 2 tall x 23 deep Unit Weight 51 lbs without water in reservior Water Supply Standard ...

Страница 6: ...temperature is the lowest temperature that can be reached by evaporating water into the air Dew point temperature is the temperature to which a given sample of air must be cooled so that moisture will start condensing out of it When air is saturated the dry bulb wet bulb and dew point temperatures will all be equal The horizontal lines show the dew point temperature on the psychrometric chart Rela...

Страница 7: ...lier type psychrometric chart for atmospheric pressure The dot shown is a state point and the following properties are known about the air water mixture at this state Take the air water mixture described by the state point above with a dry bulb temperature of 97 and 43 relative humidity for example As the air passes through the cooling media on the unit moisture is added to the air increasing the ...

Страница 8: ...ect finish 2 Align wheel plate with embedded nuts on bottom of housing 3 Attach using 2 screws 4 Repeat steps 2 and 3 for each wheel ELECTRICAL SHOCK HAZARD Serious injury or death may occur Disconnect from electrical supply before and during assembly of this product Pad Installation 1 Remove pad retainer bar 2 See page 12 Pads Washer 2 Screws 2 Pad retainer bar ...

Страница 9: ...e regulator A pressure reducing valve is installed on the float inlet Do not fill the reservoir past the MAX water level line indicator CONNECTING THE WATER SUPPLY ELECTRICAL SHOCK HAZARD Serious injury or death may occur Disconnect from electrical supply before and during assembly of this product This cooler comes equipped with a 120 volt power supply cord and should only be plugged into a 120 VA...

Страница 10: ...ttempt should be made to locate the unit in such a manner that interruption of the air pattern is held to a minimum Multiple units may be required to cover large areas ELECTRICAL SHOCK HAZARD Serious injury or death may occur Disconnect from electrical supply before servicing this product Annual start up At the beginning of each cooling season follow the same procedures as the initial start up wit...

Страница 11: ...ses Odor from Initial Wetting of Pads 1 At first use of your new cooler or after installing new replacement pads make certain there is lots of fresh air available to the cooler 2 Add one capful of liquid laundry fabric softener to the water in the bottom reservoir of the cooler 3 The odor from initial wetting of pads should disappear in approx two weeks of operation 4 If odor does not disappear af...

Страница 12: ...ations increase beyond a certain level the excess minerals precipitate out as a solid material This precipitation will appear as the familiar white residue left on the face of the media It is commonly referred to as alkali calcium depositions or salts The same process occurs in the desert when water collects in depressions and since only pure water evaporates the minerals are left behind These are...

Страница 13: ...edia s ability to introduce water into the air stream If the pad surface becomes dirty or dusty clean with a soft brush and water Daily maintenance At start up It is best to run the pump several minutes before the fan is started to clean out any debris on the media At shut down When shutting down your evaporative cooler at the end of each workday the pump should be turned off approximately 15 minu...

Страница 14: ...ystem consists of four primary elements Water Hose Float Assembly Pump and Water Distribution Channel Problem Check Solution Floor at side of the unit is wet Water inlet hose is loose at supply hose Tighten connections and or replace hose washers The unit overflows from reservoir Float valve hose is loose at bulkhead fitting or at float valve Water pressure is too high to allow float valve to shut...

Страница 15: ...rranty contract or negligence and arising in connection with the sale use or repair of the Products Seller s maximum liability shall not in any case exceed the contract price for the Products claimed to be defective or unsuitable RETURNED GOODS Equipment may be accepted for return with in 90 days of shipment when authorized by us with our return labels Request necessary permission and special Retu...

Страница 16: ......

Страница 17: ..._____________ Address _______________________________________________________ Phone Number __________________ Fax Number ___________________ You must complete this form and return within fifteen 15 days of initial purchase to validate your cooler s warranty Please call COOLSPACE 800 557 5716 if you have questions Please fax or mail this completed form to Fax to 317 485 0118 Mail to COOL SPACE Warr...

Страница 18: ......

Страница 19: ...ion 315 North Madison Street Fortville IN 46040 Phone 317 577 0417 Fax 317 485 0118 1 800 557 5716 www cool space com sales cool space com REV 06 14jw PN CSW VD MANUAL If you have questions about the product you have purchased or would like to leave us feedback please contact us via our website www cool space com or by calling 1 800 557 5716 ...

Отзывы: