background image

 

    Clock Installation Instructions 

(IPCSS-RWB/IPCSL-RWB/IPSIGNL-RWB)

 

Version 1.5   

4/20/2015 

 

 

For additional support, visit 

www.anetdsupport.com

 

 

Installation Instructions 

The following instructions should be followed for stainless steel clock 
installations.  

 

1.

 

A ferrite is included if there is concern over line performance.  Wrap Cat 5 cable around 
ferrite once and clamp shut. 

2.

 

Remove Phillips head screws from both sides of the device. (4 total) 

3.

 

Separate stainless steel baffle from wall mount bracket. 

4.

 

Mount bracket to wall using appropriate mounting hardware; see included template for 
detailed instructions or use wall bracket as a guide.  Use a minimum of 4 mounting holes. 

5.

 

Connect a network cable (Cat 5 or better) to the internal circuit board and connect any 
additional wiring to the stainless steel unit as needed. 

6.

 

Re-insert stainless steel baffle into wall mount bracket.   

7.

 

Replace 4 screws into sides of the device. 

8.

 

Connect the other end of the network cable to a PoE (Power over Ethernet) network switch, 
or a PoE injector, on a network with a DHCP server.  Some equipment options are listed on 
the support site:  

www.anetdsupport.com/peripherals

9.

 

If properly installed, the unit should boot and show the time within 30 seconds.  See 

Boot 

Sequence

 on other page for details. 

10.

 

Consult the 

Clockwise User manual

 (see 

www.anetdsupport.com/documents

) or 3

rd

 party 

software guide for further instructions on sending audio and text to the device. 

 

 

Typical model shown 

 

Отзывы: