Advanced Air 2500 Series Скачать руководство пользователя страница 10

Due to continuous product development Advanced Air (U.K.) Ltd 
reserves the right to change any information without prior notice. 

Burrell Way,  

Thetford, Norfolk, 

 IP24 3QU,  England 

Tel: +44 (0) 1842 753624    

   Fax: +44 (0) 1842 762032 

Email: [email protected] 

2500 Series  

Fire Smoke Dampers 

Date 

Issue 

Spec. No. 

Page No. 

04/03/14  Rev 2  CE –FSD Sub 

PATENT APPLIED FOR 

AFS Drywall 2 Hour - 120 

(P

ATENT

 P

ENDING

)

 

Maintenance Procedure 

 



These dampers are installed as a life-safe product and will require regular physical and visual examinations. It is essential 

that that the assembly is kept in a clean, dust free condition at all times. 



It is essential that an access door has been provided in the adjacent ductwork to facilitate the inspection and maintenance. 



Ensure that no physical restriction of the blades has occurred during the installation process. 



Remove any dirt or debris built up in the damper, apply a little WD lubricant or light oil, any excessive oils should be wiped 

away. 



Check the operation of any ancillary products that may be fitted. 



Examine the fusible link to ensure that no corrosion has occurred and that the plates are free from distortion and are in good 

condition to operate when required. 



Close the blade pack by manual operation and  examine the blades to ensure; 



They are in the fully closed position and have located in the ramps. 



They are all position in the frame correctly i.e. square to the frame. 



They are all in a clean condition. 



The period between maintenance checks can best be ascertained by system conditions or as directed by local regulations for 

ventilation plant and ancillaries, but should not exceed a maximum interval in excess of twelve months. 



The report should be completed following the Maintenance Procedure  included within this document. 

Pre Installation Notes 

 

1.  Ensure   that   the   damper   is   kept   in   a   clean  

dry environment and that there is no damage to the 

damper. 

2. 

Remove all packaging and transit ties before 

installation. 

Installation Procedure  

 

1. The Drywall which will consist of two layers of 15mm 

plasterboard each side of steel studwork with a 50mm 
Rockwool insulation. The opening will be a letterbox 
construction with overlapping layers of plasterboard 
with an opening clearance of 25mm (min) - 100mm 
(max) all around the fire damper casing (barrier 
contractor).  

2.  Two M10 drop rods shall be fitted each side of the wall 

fixed by steel anchors into the slab or soffit above. 

3.  The access side of the damper (denoted by extended 

spigot with actuator) must always be installed flush with 
the surface of the dry wall.  

4.  The gap between the damper and the wall opening will 

need filling in with at least 2 layers of 140kg/m3 50mm 
Firebatt cut to interference fit and pushed in place.  

5. The ductwork connecting to the damper spigots must 

overlap by 40mm, leaving a 10mm clearance for any 
duct expansion in a fire situation.  

6. All ductwork connections must be sealed with an 

approved ductwork sealer, and fixed with low 
resistance fixings such as: aluminium alloy rivets or 
nylon bolts. 

7. All connecting ductwork must be independently 

supported within 1meter of the connections. 

Installation & Maintenance Instructions 

10 

Содержание 2500 Series

Страница 1: ...ble link that prevent the damper from opening if the temperature has reached 720 C With the introduction of Construction Product Regulation on the 1st July 2013 all fire dampers are required to meet t...

Страница 2: ...ght to change any information without prior notice Burrell Way Thetford Norfolk IP24 3QU England Tel 44 0 1842 753624 Fax 44 0 1842 762032 Email sales advancedair co uk 2500 Series Fire Smoke Dampers...

Страница 3: ...Cambered grade 430 stainless steel Top Bottom Jambs Profiled grade 430 stainless steel riveted to damper frame Minimum Duct Size Rectangular 100mm x 100mm case size 250mm x 250mm Circular 100mm diamet...

Страница 4: ...i o s TBC AFS Blockwork Wall BS EN 1366 2 120 min E120 ve i o s AFS Adjustable Frame System PATENT PENDING With the tighter requirements of the CPR and Building regulations with regard to CE labellin...

Страница 5: ...ngland Tel 44 0 1842 753624 Fax 44 0 1842 762032 Email sales advancedair co uk 2500 Series Fire Smoke Dampers Date Issue Spec No Page No 04 03 14 Rev 2 CE FSD Sub PATENT APPLIED FOR 5 Sizing Informati...

Страница 6: ...using 750mm wide units tests performed in a clean system at suitable pressures and are P re ssu r e D r o p s F u l l y O p e n 1 1 0 1 0 0 1 0 0 0 1 1 0 1 0 0 V e lo c it y m s Pressure drop Pa 6 1 0...

Страница 7: ...s aluminium alloy rivets or nylon bolts 9 All connecting ductwork must be independently supported within 1meter of the connections 10 An Access cover should be fitted on the appropriate side of the ba...

Страница 8: ...y 7 The ductwork connecting to the dampers long spigot must overlap by 40mm The ductwork connecting to the short spigot must overlap the spigot by 40mm leaving 10mm clearance for any duct expansion in...

Страница 9: ...tilation plant and ancillaries but should not exceed a maximum interval in excess of twelve months The report should be completed following the Maintenance Procedure included within this document Pre...

Страница 10: ...ce checks can best be ascertained by system conditions or as directed by local regulations for ventilation plant and ancillaries but should not exceed a maximum interval in excess of twelve months The...

Страница 11: ...ion of Fire Dampers must be done by competent trained persons who are familiar with the type of product They should follow the following essential safety practices Wear appropriate PPE gloves footwear...

Страница 12: ...ght to change any information without prior notice Burrell Way Thetford Norfolk IP24 3QU England Tel 44 0 1842 753624 Fax 44 0 1842 762032 Email sales advancedair co uk 2500 Series Fire Smoke Dampers...

Страница 13: ...tch wiring for damage where applicable Check damper for cleanliness and clean where necessary Check the condition of the blades and seals rectify and report where necessary Confirm the safety closure...

Отзывы: