background image

2

61287701G1-22A

CAUTION

!

Do not use a knife to cut the opening in the rubber grommets.
This may result in an excessively large hole and compromise the
integrity of the unit allowing moisture into the unit.

Ground Connection

Install the ground connection (see illustration below by 
completing the following steps:

1. Remove the rubber grommet from the housing and insert a 

#6 solid copper ground wire through the rubber grommet. 

2. Using the figure on top of page 3, route the ground wire as 

shown and attach it to the ground bar.

3. Replace the rubber grommet in the housing.
4. Route the ground wire 12 inches below finished grade by 

the shortest and most direct route to the AC power ground 
system Multi Grounded Neutral (MGN) of the customer 
premises. Ensure the wire is free of any sharp bends.

5. Attach the ground wire to the side of the subscriber’s 

premises with stainless steel half moon clamps or tie-wrap 
the ground wire to the riser conduit of the Buried Fiber 
Drop. 

6. Clean the MGN connector with emery cloth to insure a 

stable connection.

7. Attach the ground wire from the SFU ONT to the MGN 

connector with the appropriate UL approved ground 
clamp/fitting.

8. Coat the connection with a metal corrosion preventative.
9. Attach a Warning Ground Tag to this grounding connection.

Power/Alarm Connections

NOTE

Wiring the Power/Alarm connector improperly could damage
the SFU.

The SFU ONT is supplied with a 7-conductor Euro-style Power/
Alarm connector. To make connections from the UPS to the 
power connector complete the following steps:

1. Remove the Power/Alarm Connector by pulling it out of the 

electronics module. 

1

2

3

A telephony/data communication test set

PON power meter with wavelength filtering

Fiberscope or videoscope

Two #10 screws and appropriate surface anchors for 
mounting the SFU ONT

Assorted tie wraps for securing cabling and wiring

One RJ-45 plug

Two RJ-11 plugs (when not using two-screw terminal bridges)

For fiber optic connections, the following are required:

Fiber splicing tools

Fiber cleaning materials

SC/APC fiber connector (Green)

Included with the SFU ONT packaging are 2 two-screw terminal 
bridges, fiber cable management and strain relief, a fiber 
connector, and electronics/optics. For data, the connection to the 
SFU is through the RJ-45 Ethernet connector. For POTS, the 
connection is made through two-screw terminal bridges, or RJ-11 
connections. 

Mount the Enclosure

CAUTION

!

•  

This equipment must be connected to a known, reliable earth

ground at all times during installation and service. Refer to the
National Electrical Code (NEC) and state/local codes for
details on grounding requirements. A 12 AWG copper ground
conductor shall be used to connect the equipment to earth
ground.

•  

This equipment must be serviced by authorized service

personnel only. All repair procedures are detailed to allow
sub-assembly level repairs ONLY. Authorized service
personnel should not attempt component level repairs or
circuit modifications to the printed circuit board. Improper
repairs can create a safety hazard.

Complete the following steps to mount the enclosure:

1. Choose a vertical surface near an approved ground, but 

away from down spouts, permanent water sprinklers, or 
other water sources. The subscriber should have easy access 
for testing.

2. Use the top and bottom external mounting holes as a 

template to mark fastener locations. Use a level to ensure the 
unit is level to prevent warping.

3. Pre-drill the marked locations and install fasteners or 

anchors appropriate to the mounting surface (each anchor 
rated to 15 lbs minimum).

4. Mount the SFU ONT to the side of the subscriber’s premise.

The Electronics Module is installed in the housing and swings 
open on hinges. To release this module, loosen the Security Screw 
(refer to the illustration on the first page) and swing the 
electronics Module to the left.