manualshive.com logo in svg
background image

2

Copyright © 2011 ADTRAN, Inc. All Rights Reserved.

Quick Start Guide, 61200825G1-13A, February 2011

3

Figure 1. Installing the PoE Module

Before touching electronic components, make sure you are properly 

grounded. By wearing a wrist strap (or using some other type of static 

control device), you can prevent static electricity stored on your body or 

clothing from damaging your installation. 

W

ALL

 M

OUNTING

 

THE

 P

O

E P

OWER

 S

UPPLY

 (O

PTIONAL

)

1.

Decide on a location for the power supply. Keep in mind that the power supply needs to be 
mounted close enough to the NetVanta unit for the cords to reach the receptacles.

2.

Prepare the mounting surface by attaching a board (typically plywood, 3/4-inch to 1-inch 
thick) to a wall stud (see 

Figure 2

).

Important! Mounting to a stud ensures stability. Using sheetrock anchors may not 
provide sufficient long-term stability.

 

3.

Install two #8 PAN head screws (1-inch or greater in length) wood screws into the mounted 
board, following these guidelines:
• Mark the exact positioning of the screws by using the keyhole slots on the sides of the 

unit as a template. 

• Screws should be horizontally level with each other.
• Leave approximately 1/4-inch of the screws protruding from the board to allow the heads 

of the screws to slide into place in the unit’s keyhole slots. 

4.

Insert the screws through the keyhole slots in both sides of the unit and slide the slot 
securely onto the screws.

5.

Proceed to the steps given in 

Powering the NetVanta and PoE Switchports.

Figure 2. Wall Mounting the Power Supply

Отзывы: