background image

4    

Issue 4, August 2004

61212073L1-5D

120 VAC outlet. (See 

Figure 5

.) The output wire on the 

PS/R terminates in a modular connector. An extension 
wire with a matching connector is included. The 
extension wire has ring terminals on the far end for 
connection to the NIU3 shelf power terminals.

The red wire is –54 VDC and connects to the 

PWR A

 

terminal; the black wire is the return and connects to the 

RET A

 terminal; the green wire connects to the frame 

ground. 

Figure 5.  Power Supply/Rectifier Connection

Alarms

A 3-post wire-wrap terminal (

P7

) on the shelf 

backplane selects either a normally closed (

COM

/

NC

or a normally open (

COM

/

NO

) alarm relay. The alarm 

relay output responds to the card malfunction status on 
individual NIU3 cards.

1. Determine if the desired alarm output is a NO or a 

NC response.

2. Make wire-wrap connections accordingly.
3. If not already done, connect alarm output to 

designated terminations.

CAUTION

After wiring connections are made, replace
power and alarm security covers.

Options

Aside from mounting configuration, connecting 
redundant power, and alarm NO/NC selection, there are 
no options associated with the shelf.

Final

After power and alarm wiring is connected and verified 
in accordance with local standards, codes, and this 
practice, perform the following tasks:

1. Dress and lace wiring to workmanship standards.
2. Install all protective shields and panels that were 

removed for wiring installation.

3. Provide power to the backplane.

5. TURNUP

When an NIU3 is inserted into a shelf with power on the 
backplane, the 

STATUS

 LED turns on red while the 

NIU3 performs a self-test. If the test passes, the 

STATUS

 LED turns on green, and the other LEDs go 

through an on/off sequence, indicating the NIU3 is 
online. If the test fails, the 

STATUS

 LED remains red, 

and the bypass relays (ADTRAN patent pending) 
maintain data flow around the NIU3.

6. OPERATION

The NIU3 3-Slot Shelf exchanges data to and from the 
network loop and customer loop via the BNC 
connectors. If the NIU3 fails or is removed from the 
circuit, the affected card relays on the backplane 
provide pass-through transmission so data flow is 
maintained.

During normal operation, the NIU3 is transparent to the 
network. In the event of circuit trouble, test equipment 
at the central office can monitor the loop. When a 
loopback is initiated, the transmit/receive paths can be 
tested to the customer interface. NIU3 troubleshooting 
tests are intrusive to data transmission.

LED Indication

There are no LEDs on the 3-slot shelf. However, NIU3 
LEDs provide information for NIU3 and shelf configu-
ration and status.

7. MAINTENANCE

Aside from replacing failed relays, the NIU3 3-Slot 
Shelf does not require maintenance for normal 
operation. ADTRAN does not recommend field repair. 
For repair services, refer to 

Warranty and Customer 

Service

.

PWR A

GRN

RED

BLK

TB1

-54V

2.0 A

RET A

PWR B

RET B

Содержание DS3 NIU3

Страница 1: ...he backplane circuitry is protected by a metal cover that has openings for BNC data jacks pass through relays power terminal connections and alarm pins Removable covers provide security for power and alarm connections and pass through and alarm relays All connections are clearly labeled Features The NIU3 3 Slot Shelf provides the following features and functions Field replaceable pass through rela...

Страница 2: ...212078L1WM accommo dates a stack of two 3 Slot Chassis Six x inch bladed hex head screws and flat washers are provided with the 1212078L1WM wallmount bracket for attaching to the wall In this configuration the original flanges are removed and the wallmount flanges are installed using the countersink screws from the originals If using P N 1212073L1WM install the chassis so the circuit cards front p...

Страница 3: ... local supply to PWR A 2 Connect the associated return wire to RET A 3 If redundant power is intended make similar connections to PWR B and RET B CAUTION Terminate grounds to an approved ground location Check metal to metal contact on all ground connections Verify ground circuit continuity 4 Connect the common frame ground terminal or ground lug 6 AWG max to an approved ground location CAUTION Per...

Страница 4: ... standards 2 Install all protective shields and panels that were removed for wiring installation 3 Provide power to the backplane 5 TURNUP When an NIU3 is inserted into a shelf with power on the backplane the STATUS LED turns on red while the NIU3 performs a self test If the test passes the STATUS LED turns on green and the other LEDs go through an on off sequence indicating the NIU3 is online If ...

Страница 5: ...cent to the alarm wire wrap pins on the backplane The alarm relay output responds to the card malfunction status on individual NIU3 cards If an alarm condition occurs but an alarm signal is not present then a failed alarm relay is indicated Follow this procedure to replace a failed alarm relay 1 Using an appropriately sized IC extractor tool lift the relay off its socket 2 Align and insert the rep...

Страница 6: ...es support CAPS requests or further information ADTRAN Sales Pricing Availability 800 827 0807 ADTRAN Technical Support Pre Sales Applications Post Sales Technical Assistance 800 726 8663 Standard hours Monday Friday 7 a m 7 p m CST Emergency hours 7 days week 24 hours day ADTRAN Repair CAPS Return for Repair Upgrade 256 963 8722 Repair and Return Address Contact Customer and Product Service CAPS ...

Отзывы: