Industrial PCs MCR5000
© ads-tec GmbH • Raiffeisenstr.14 • 70771 Leinfelden-E
3.2
O
RDER OF INSTALLATIO
The following must
•
Check the b
•
Monitor is p
•
Monitor wei
•
Monitor size
•
Installation
(0° with DV
•
Observe the
Note:
The maximum torq
installation. Tighten
Echterdingen
ON
be checked before starting the installation:
bearing capacity of the wall
ermitted for fixing with M6 screws by VESA 100/2
ght
≤
50kg
e
≤
50"
incline
≤
30° from vertical line
D operation!)
e monitor data sheet!
que for fixing the MCR 5000 installation screws i
en screws evenly.
13
200
is 5 Nm for wall-mount