FLUE PASSAGEWAY AND FLUE BOX

 

 

The flue passages and flue box should be inspected 

and cleaned prior to each heating season. The 

sequence of operation should be as follows:

 

 

 Turn off both electrical and gas supply to unit.

 

 

 Disconnect combustion air inducer wiring.

 

 

 Remove screws securing flue box to unit. Remove 

flue box. If necessary, remove blower assembly 

from flue box. Clean flue box with wire brush.

 

 

 Remove baffle retention bracket and flue baffles.

 

 

Clean flue baffles with wire brush.

 

 

  Remove burners as described in Burners" section.

 

 

 Clean tubes with a wire brush.

 

 

 Reassemble unit. The combustion air and flue box 

gaskets should also be replaced during 

reassembly.

 

 

 Restore electrical power and gas supply.  Follow 

lighting instructions to light unit. Check operation 

of unit.

 

 

COMBUSTION AIR INDUCER

 

 

Under normal operating conditions, the combustion air 

inducer should be checked and cleaned prior to the 

heating season with the power supply disconnected. 

Use a small brush to clean inducer wheel.

 

 

ELECTRICAL

 

 

−  Check all wiring for loose connections.

 

 

−  Check for correct voltage at unit (unit operating).

 

 

−  Check amperage draw.

 

 

FLUE AND CHIMNEY

 

 

Check all vent and vent connector joints for tightness. 

Ensure that connections are sealed and that there are 

no blockages.

 

FAILURE TO OPERATE

 

 

If unit fails to operate check the following:

 

 

 Is thermostat calling for heat?

 

 

 Is main disconnect closed?

 

 

 Is there a breaker tripped or a fuse blown?

 

 

 Is gas turned on at meter?

 

 

 Is manual shutoff valve open?

 

 

 Is unit ignition system in lock out? If unit locks out 

again, call service technician to inspect unit.

 

 

 Is  pressure switch closed? Obstructed flue will 

cause unit to shut off at pressure switch. Check 

flue passage and outlet.

 

 

SAFETY SHUT

−OFF VALVE TEST

 

 

The safety shut

−off valve test procedure is as follows:

 

 

 Turn off the manual gas valve.

 

 

 Set the thermostat to call for heat.

 

 

 System begins normal sequence of operation.

 

 

 After approximately 30 seconds (pre purge period) 

the LED will fast flash indicating the gas valve is 

powered.

 

 

 After 10 seconds, the gas valve closes and steps 

4 and 5 will repeat two additional times before 

locking out the gas valve, which will be indicated 

by two flashes on the LED.

 

 

 To restart the system, de

−energize the thermostat 

call for heat and follow the operating instructions 

under Unit Start

−Up".

 

 

REPAIR PARTS

 

 

When ordering repair parts include the complete unit 

model number listed on the unit rating plate. For 

example: SEP

−175A−1.

 

 

START

−UP AND PERFORMANCE CHECKLIST

 

 

 

Job Name:

 

 

 

Job No.:

 

 

 

 

 

Date:

 

 

 

   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Job Location:

 

 

 

City:

 

 

 

 

 

State/Province:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Installer:

 

 

 

City:

 

 

 

 

 

State/Province:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Unit Model No.:

 

 

 

Serial No.:

 

 

 

 

Service Technician:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Electrical Connections Tight?

  

 

 

 

 

Air Shutters Properly Adjusted (If Installed)?

  

 

 

 

Supply Voltage

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Flue Connections Tight?

 

 

 

 

Blower Motor Lubrication O.K.?

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Fan Timer Operation Checked?

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Gas Piping Connections Tight & Leak

−Tested?

 

 

 

 

 

 

 

 

 

 

 

 

 

 

THERMOSTAT

 

 

 

 

Blower Motor Amps

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   

 

 

 

 

 

Furnace Btu Input

 

 

 

 

 

 

Calibrated?

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Heat Anticipator Properly Set?

 

 

 

 

Line Pressure

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Manifold Pressure

   

w.c.

 

Level?

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   

 

 

 

 

17

Содержание SEP-100

Страница 1: ...ist 17 Template 18 Warranty 19 RETAIN THESE INSTRUCTIONS FOR FUTURE REFERENCE WARNING FIRE OR EXPLOSION HAZARD Failure to follow safety warnings exactly could result in serious injury death or property damage Be sure to read and understand the installation operation and service in structions in this manual Improper installation adjustment alter ation service or maintenance can cause serious injury...

Страница 2: ...IEW A B C D E F G H Unit in mm in mm in mm in mm in mm in mm in mm in mm SEP 100 SEP 115 31 5 16 795 32 3 16 817 20 3 16 512 11 1 2 292 19 1 16 484 11 3 4 298 3 1 4 83 7 7 8 200 SEP 145 SEP 175 31 5 16 795 32 3 16 817 23 1 8 588 11 1 2 292 22 1 16 560 8 1 2 216 3 1 4 83 8 11 16 220 SEP 200 SEP 230 SEP 250 31 5 16 795 32 3 16 817 41 1 8 1045 3 11 16 97 40 1016 17 3 4 451 3 1 2 89 8 11 16 220 SEP 30...

Страница 3: ...5203 1 SEP 100 through 145 require replacement combustion air inducer pressure switch at altitudes over 5500 feet above sea level 2 SEP 175 requires replacement combustion air inducer pressure switch at altitudes over 2500 feet above sea level TABLE 2 SEP 230 to SEP 400 Gas Part No Stainless Steel SEP 230S SEP 250S SEP 300S SEP 345S SEP 400S Heating Performance Part No Aluminized Steel SEP 230A SE...

Страница 4: ...l codes with the current edition of CSA B149 installation compliance codes All electrical wiring and grounding for the unit must also comply with the current edition of CSA C22 1 Canadian Electrical Code These unit heaters are CSA certified for clearances to combustible material listed on the rating plate and table 3 Adequate clearance must be provided around the appliance and around air openings ...

Страница 5: ...r air pressure caused by exhaust fans etc If sufficient quantities of combustion air are not available the heater or another appliance will operate in an inefficient manner resulting in incomplete combustion which can result in the production of excessive carbon monoxide CAUTION If indoor air is to be used for combustion it must be free of the following substances or the life of the heat exchanger...

Страница 6: ...l or nearly so used to convey flue gases from an appliance or its vent connector to the outside atmosphere The vent connector is the pipe or duct that connects a fuel gas burning appliance to a vent or chimney NOTE Local codes may supersede any of these provisions GENERAL RECOMMENDATION AND REQUIREMENTS SEP unit heaters must be vented in compliance with the latest edition of the National Fuel Gas ...

Страница 7: ... the vent at least 4 102 mm above the connected SEP connection When common venting with another SEP unit maintain at least a 4 102 mm vertical separation between the vent connectors 4 Clearance to combustible material is 6 152mm for single wall vent material except where a listed clearance thimble is used Clearance to combustible material for type B 1 vent or factory built chimney is per manufactu...

Страница 8: ...compliance codes and with local authorities with jurisdiction 6 Vent termination must be a minimum of 4 feet 1 2m horizontally from any soffit or under eave vent 7 Vent termination must be a minimum of 6 feet 1 83 m from an inside corner formed by two exterior walls If possible leave a 10 foot clearance 8 Vent termination must be a minimum of 10 feet 3m from any forced air inlet includes fresh air...

Страница 9: ...perature MIN sealant provided in kit 30 5 CM VENT TERMINATION TEE OR 90 LISTED WALL ELBOW THIMBLE 12 30 5CM THROUGH MINIMUM ABOVE COMBUSTIBLE HIGHEST WALL SNOWFALL DRAIN LOOP WITH WATER TRAP TO CONDENSATE TRAP GROUND LEVEL Provided by installer FIGURE 3 CONDENSATE DRAIN THROUGH TEE PIPE AND DRAIN LOOP DOWNWARD SLOPE ON HORIZONTAL VENT Venting may be single wall 26 GSG galvanized or equivalent stai...

Страница 10: ...for Horizontal Vent Applications Unit Part Number Description 66808902 4 upward sloped Cat III vent kit 66809002 4 downward sloped Cat III vent kit SEP 100 66809102 4 90 elbow Cat III optional SEP 115 66809301 4 straight pipe length 6 SEP 145 66809302 4 straight pipe length 12 66809303 4 straight pipe length 36 66808903 5 upward sloped Cat III vent kit SEP 175 66809003 5 downward sloped Cat III ve...

Страница 11: ...all a separate fused disconnect switch with the fuse sized according to blower motor size Connect wiring through knockout on the junction box located on the side of the unit heater Refer to heater wiring diagram for connection information Use 18 gauge wire or larger for thermostat connections NOTE Electrically ground unit in accordance with local codes or in the absence of local codes in accordanc...

Страница 12: ...in power to unit These devices should be properly labeled by the installer GAS SUPPLY TO UNIT HEATER MANUAL MAIN SHUT OFF DISCONNECT GAS VALVE WILL NOT HOLD NORMAL TEST VALVE WHEN TEST PRESSURES OF 1 2 psig PRESSURES OF 1 2 psig 3 45kPa 3 45kPa OR HIGHER OR HIGHER WILL BE USED CAP UNIT HEATER FIGURE 7 Unit Start Up FOR YOUR SAFETY READ BEFORE LIGHTING WARNING Electric shock hazard Can cause injury...

Страница 13: ...ped with an ignition device which automatically lights burners DO NOT attempt to light the burners manually 5 Turn the manual knob on gas valve clockwise to OFF Do not force 6 Wait five minutes to clear out any gas If you then smell gas STOP Immediately call your gas supplier from a neighbor s phone Follow the gas supplier s instructions If you do not smell gas go to next step 7 Turn manual knob o...

Страница 14: ...ately 45 seconds after ignition is established 8 After the thermostat demand is satisfied the gas valve is closed Five seconds after the demand is satisfied the combustion air inducer is shut off 9 The ignition control must shut off the system fan approximately 150 seconds after the gas valve is de energized Ignition Control LED The ignition control contains a green LED which indicates the followi...

Страница 15: ...der pressure switch 176722600 No adjustment to switch is required TABLE 10 LP PROPANE GAS MANIFOLD PRESSURES in w g kPa ALTITUDE FEET METERS SEP 0 2000 2001 2500 2501 3500 3501 4500 4501 5500 5501 6500 6501 7500 UNIT 0 610 610 762 763 1067 1067 1372 1372 1676 1677 1981 1981 2286 SEP 100 9 0 9 0 9 0 9 0 8 7 8 4 8 1 SEP 115 2 24 2 24 2 24 2 24 2 16 2 09 2 01 SEP 300 SEP 145 9 0 8 7 8 4 8 1 7 8 7 5 7...

Страница 16: ...CAUTION The unit heater and vent system shall be inspected once a year by a licensed professional service technician or equivalent LUBRICATION 1 Combustion air inducer motor bearings are pre lubricated and sealed No further lubrication is necessary 2 Fan motor bearings should be lubricated according to manufacturer s instructions on each motor If no instruction is provided use the following as a g...

Страница 17: ... closed 3 Is there a breaker tripped or a fuse blown 4 Is gas turned on at meter 5 Is manual shutoff valve open 6 Is unit ignition system in lock out If unit locks out again call service technician to inspect unit 7 Is pressure switch closed Obstructed flue will cause unit to shut off at pressure switch Check flue passage and outlet SAFETY SHUT OFF VALVE TEST The safety shut off valve test procedu...

Страница 18: ...TEMPLATE Location of Combustion Air Inducer Mounting Holes for Rotated Inducer EXISTING HOLE EXISTING HOLE EXISTING HOLE 18 ...

Страница 19: ...y installed operated and maintained in accordance with the installation operation and maintenance instructions provided with each unit Unauthorized alteration of ADP product may void this warranty Conditions of Warranty Replacement parts furnished under this warranty will be warranted for the balance of the original warranty term of the unit including any extended warranty and will not serve to ex...

Страница 20: ......

Отзывы: