background image

PRIOR TO INSTALLATION

IMPORTANT!

ENSURE ALL TILES EXTEND BEHIND AND BENEATH THE BATHROOM FURNITURE. 

 

ADP do not recommend tiling in furniture due to moisture and mould build up which can 

damage the material and void the warranty.

ALL AREAS WHERE CABINET MEETS WALL AND/OR FLOOR MUST BE SEALED USING 

A NEUTRAL CURE SILICONE. 

All edges where vanity top meets cabinet, wall or surrounding furniture must also be 

sealed with a continuous bead of silicone.

 

We recommend that a qualified trades person install this product and we would expect 

the installation to be undertaken in a trades person like manner and finished to a trades 

person standard. This product carries a full warranty against faulty workmanship and 

materials. Please inspect thoroughly before installation to ensure that the product has 

not been damaged. It is the responsibility of the installer to make any adjustments to 

doors/drawers after installation if required.

Check products for any damages

Positioning & Ventilation

Check for Support Beams

Check for Plumb Walls & Level Floors

Check plumbing positions align with product interior configurations. 

Within 48 hours of receiving your goods, unpack your ADP 

product and check for any damages or missing parts.

No claims for damages will be recognised after installation. 

Check Step 1 on installation guide for parts list. If any 

parts are missing, please contact your place of purchase. 

Please note: screws/bolts are not supplied.

Furniture must be at least 300mm away from any wet 

areas. Materials used in the construction of our units are 

moisture resistant, not water proof. 

Do not expose furniture to shower spray.

It is important that your bathroom is adequatley  

ventilated to eliminate moisture build up. 

High humidity will lead to permanent dampness and 

mould resulting in a deterioration of the materials in your 

bathroom. 

Wall hung furniture and wall hung ceramic basins require 

fixing to a support beam fitted between the studs to 

give a solid wall backing to attach the vanity.  If neces-

sary fix additional support noggins at desired height for 

cabinet and basin fixing. Ensure total width of support 

noggin exceeds vanity width. 

Refer to Step 2 for recommended height for your 

type of vanity.  

1

2

3

4

5

Ensure the Wall is plumb and straight, ensure floor is level. If 

you fix the product to a non-plumb wall or floor the following 

could happen:
• 

Your door or drawers will not operate correctly 

• 

Door or drawer adjustments will not align. 

• 

Basins will not sit level, which may cause water to pool 

or not drain properly

If it is not possible to make the wall or floor plumb and 

straight you must pack the vanity out so that it does not 

follow the out of aligned wall. 

Floor standing vanities must sit on a level floor or be packed 

so they sit level and true.

Please note

 if your vanity is fixed to a bowed wall, the 

fastening of the fixings will force your cabinet into a twist 

and benchtop materials may crack due to increased stress on 

joins and materials. 

Please note

 if your product has any electrical fittings 

please allow for this and talk to your electrician

Take note of clearances behind drawers when  

considering water supply fittings inside cabinet. 

A - 300mm 

(minimum clearance)

A

Отзывы: