CM SU8X10 STRAPS TM ZZZ-155 MAS-HL.doc ZZZ-155-MAS-HL
4
ASSEMBLY INSTRUCTIONS
1. Assembly of middle arches
a) Take one arch (UD); assemble with one corner arch (UG) on the left side.
b) Insert the other corner arch (UG) on the right side.
c) Take one completed arch; put screw 1-3/4" (O) through holes
on the right side and attach bar (UE) over screw and tighten wing nut (Q).
d) Repeat same procedures on the left side.
2.
Repeat step 1 for the remaining middle arches.
3. Assembly of end arches (Wing nuts are always on inside)
a) Take one arch (UD); assemble with one corner arch (UG) on the left side.
b) Slide the hooks (M) over bar (UE), then attach one end of the bar
to the arch with screw 1-3/4" (O) and wing nut (Q).
c) Insert the other corner arch (UG) on the right side and attach to it the other end of bar (UE).
d) Repeat step 3 with the remaining arch.
e) Place one of the assembled end arches at the front of the shelter, the other at the back.
4. Assembly of legs
a) Insert (UA) legs into one end arch one side at a time.
b) Insert (UB) legs into the remaining arches.
c) Add second arch to assembly by connecting UH and UZ and diagonal (UF) (in 2 pcs f
or 10’ long) with screws 2 ½” (P) and
wing nuts (Q). See sketch on first page. Note: (UZ) should be placed in the last section.
d) Repeat steps b) and c) until the whole shelter is completed.
e) Make sure the base is open to 8
’2’’, measured from the exterior of the pipes, in front and back (AC, BD).
f) Verify that diagonal distances AD and BC are equal, and lengths AB and CD are equal.
5. Cover installation (Ties are always on the inside)
a) Place the roof in front of the shelter as illustrated.
b) Unfold as illustrated then lift onto shelter as is.
c) Place cover over the completed structure making sure that the TRIANGLE
is at the front of the garage.
d) Lace rope through grommets and around pipes tightly going completely
around the garage. Grommets are placed in the upper corner of each door. Put
the remaining cord through these grommets and secure to the ground with nails.
e) Tie inside ties firmly to bars.
6. Door Assembly
a) Take one door with shiny side facing outside placing on to hooks (M).
b) Repeat a) for the remaining doors.
c) Take an elastic, put it through one of the grommet holes on the door from the inside
out. Take S hook, place it on the elastic and squeeze one end with a pair of pliers
so it locks on the elastic. Repeat until all the elastics are done, and then use the
open end to hook on the grommet band on the side of the roof.
7. Anchoring garage.
a) Place your garage in the final position you want then close the front and back doors
(if supplied) before anchoring. Anchor with brackets (06-394) and anchor rods (06-410)
as per diagram on the first page. Drive anchor into ground.
b) Fix flap to your house (if applicable).
A
B
C
D
8
’
2
’’