![adept technology AdeptViper s650 Скачать руководство пользователя страница 28](http://html1.mh-extra.com/html/adept-technology/adeptviper-s650/adeptviper-s650_user-manual_2850460028.webp)
Chapter 3 - Robot Installation
28
AdeptViper s650/s850 Robot User’s Guide, Rev A
Transport Procedure
Step
Procedure
Drawing
1
Before transportation, set the robot in
a transport position as shown at right
by manually moving the second, third
and fourth axes.
When unpacked first, the robot is in
the transport position, so this job is
not required.
Transport Position
Axis Angle
First axis (J1)
0°
Second axis (J2)
-145°
Third axis (J3)
+243°
Fourth axis (J4)
-90°
Fifth axis (J5)
-90°
2
Disconnect the robot control cable, air
piping and user signal cables from the
robot unit.
When the robot unit is first unpacked,
this job is not required.
3
As shown at right, mount the
eyebolts.
When delivered, the robot unit is
packed with eyebolts attached, so this
job is not required
Eyebolts
Содержание AdeptViper s650
Страница 1: ...AdeptViper s650 s850 Robot User s Guide...
Страница 2: ......
Страница 8: ...Table of Contents 8 AdeptViper s650s 850 Robot User s Guide Rev A...
Страница 38: ...Chapter 3 Robot Installation 38 AdeptViper s650 s850 Robot User s Guide Rev A...
Страница 48: ...Chapter 4 System Installation 48 AdeptViper s650 s850 Robot User s Guide Rev A...
Страница 56: ...Chapter 5 System Operation 56 AdeptViper s650 s850 Robot User s Guide Rev A...
Страница 62: ...Chapter 6 Maintenance 62 AdeptViper s650 s850 Robot User s Guide Rev A...
Страница 70: ...Chapter 7 Technical Specifications 70 AdeptViper s650 s850 Robot User s Guide Rev A...
Страница 74: ...Index 74 AdeptViper s650 s850 Robot User s Guide Rev A...
Страница 75: ......
Страница 76: ...3011 Triad Drive Livermore CA 94551 925 245 3400 P N 05173 000 Rev A...