
Chapter 5 - Optional Equipment Installation
68
Adept Cobra i600/i800 Robot User’s Guide, Rev E
Figure 5-10. Solenoid Placement Using Mounting Hardware
9. Install the appropriate lengths of 4 mm (5/32 in.) plastic tubing (supplied) into
the two output ports on the manifold. Route the tubing up along the tower
bracket next to the quill and down through the center of the quill. Use cable ties,
as needed, to secure the tubing.
10. Loosen the securing screw on the AIB chassis, and lower the chassis down flat.
See
for the location of the securing screw.
11. Remove the cable strap plate by removing two screws and split washers. See
. This allows the harness to move when you lift the J1 cover in the next
step.
Figure 5-11. Removing the Cable Strap Plate
12. Remove the four screws for the Joint 1 cover and lift the cover up so you have
access to the tubing under the cover. See
Air intake
coupling with
spare air line
Tubing connected
to output port
Mounting screws for
solenoid assembly
Two M5 x 8 screws
Cable Strap Plate
Содержание Adept Cobra i600
Страница 1: ...Adept Cobra i600 i800 Robot User s Guide ...
Страница 2: ......
Страница 10: ......
Страница 14: ......
Страница 34: ......
Страница 56: ...Chapter 4 System Installation 56 Adept Cobra i600 i800 Robot User s Guide Rev E ...
Страница 76: ...Chapter 5 Optional Equipment Installation 76 Adept Cobra i600 i800 Robot User s Guide Rev E ...
Страница 104: ...Chapter 6 System Operation 104 Adept Cobra i600 i800 Robot User s Guide Rev E ...
Страница 116: ...Chapter 7 Maintenance 116 Adept Cobra i600 i800 Robot User s Guide Rev E ...
Страница 147: ...Index Adept Cobra i600 i800 Robot User s Guide Rev E 147 ...
Страница 148: ......
Страница 149: ......
Страница 150: ...5960 Inglewood Drive Pleasanton CA 94588 925 245 3400 P N 03589 000 Rev E ...