background image

Maintenance Instructions 

(ADT927) 

 
 
 

Preparation for maintenance or repair service.   
 

1. Open vent valve and isolation valve,(Counterclockwise) push the   

  

liquid out of piston cavity by turning the pre-pressurization wheel   

  

clockwise until it is completely in. 

2. Drain the liquid media out of the pump. 
3. Close the isolation valve by turning clockwise until closed. 
4. Close vent valve by turning clockwise until closed. 

 

 

 

 
 
 
 
 
 
 
 
 

Isolation Valve 

Vent Valve 

Pre-pressurization 
wheel 

High-pressure 
pressurization handle 

Отзывы: