UHA S
TANDARD
U
NIT
H
EATER
I
NSTALLATION
O
PERATION AND
S
ERVICE
M
ANUAL
36 of 59
. Clean any deposits
from the main burner which may have formed in
the injectors or venturi of the burner.
3. Check condition of ignition electrode and flame
probe. Clean off any deposits which may have
formed, check condition of ceramic insulators.
Replace as required.
13.3 Fan/Motor Assembly Maintenance
The main fan bearings are permanently sealed and
do not need lubrication. Before cleaning, turn off gas
and electrical supply. Remove the fan(s) and use a
small brush or duster to clean the fan blades from
each side. Replace fan when done.
13.4 Heat Exchanger Maintenance
The heat exchanger will remain clean unless a
problem has developed with combustion. Inspect the
heat exchanger. Look for signs of overheating at the
front tubes which may indicate burner over firing or
persistently low air flows.
13.5 Gas Valve Maintenance
No regular maintenance is required on this device.
To change gas control valves,
Do not repair or disassemble gas valve.
Replace faulty gas valves with genuine replacement
parts sold and supplied by Addison.
13.6 Flue Blower
The flue blower should not require maintenance.
However, if the air pressure switch is causing burner
lockout, then remove the flue blower from the vent
box by unscrewing the screws at the mounting plate.
Screw quantity will vary by model size. Remove the
screws attaching the mounting plate to the fan inlet
. Ensure that the fan is free to run and
that the fan wheel is clean.
13.7 Venting and Air Intake Pipe
Inspect all venting and air intake pipe. Ensure that
all seams are sealed and suspension points secure.
Repair suspension points if any part of the venting
or combustion air pipe is sagging. Check to make
sure any insulation is not missing or in poor
condition. Replace as necessary. Check all venting
and air intake components to ensure they are in
good condition, gas tight and corrosion-free.
13.8 Maintenance Checklist
Installation Code and Annual Inspections:
All
installations and service of ADDISON
®
equipment
must be performed by a contractor qualified in the
installation and service equipment sold and supplied
by Addison and conform to all requirements set forth
in the ADDISON
®
manuals and all applicable
governmental authorities pertaining to the
installation, service, operation and labeling of the
equipment.
To help facilitate optimum performance and safety,
Addison recommends that a qualified contractor
conduct, at a minimum, annual inspections of your
ADDISON
®
equipment and perform service where
necessary, using only replacement parts sold and
supplied by Addison.
Annual Fall Start-Up
Follow entire start-up procedure at this time and check control settings and
operation.
The Vicinity of the Heater
Do not store or use flammable objects, liquids or vapors near the heater.
Immediately remove these items if they are present.
Vehicles and Other
Objects
Maintain the clearances to combustibles.
Do not hang anything from, or place anything on, the heater.
Make sure nothing is lodged in between the heat exchanger or in the louvers.
Immediately remove objects in violation of the clearances to combustibles.
Содержание UHAS 150
Страница 2: ......
Страница 4: ......
Страница 8: ......
Страница 48: ...UHA STANDARD UNIT HEATER INSTALLATION OPERATION AND SERVICE MANUAL 40 of 59 14 1 General...
Страница 68: ...UHA STANDARD UNIT HEATER INSTALLATION OPERATION AND SERVICE MANUAL 60 of 59...
Страница 70: ......
Страница 71: ......
Страница 72: ......
Страница 73: ......
Страница 74: ......