
Installation: (When the machine is used for the first time)
ELECTRICAL REQUIREMENTS
The brewer has an attached cord set rated 120 volts AC, 60 Hz, 15 Amps,
single phase, and with a grounding pin. Improper electrical installation will
damage electronic components.
CAUTION: The brewer must be disconnected
from the power source throughout the initial set-
up, except when specified in the instructions.
1. Place the Machine on a firm and horizontal table.
2. Put spring and wedge it on the bottom of the
Basket
.
3. Slide the Filter Basket into the rails.
4. Place a decanter at the base of machine, under the
Basket
.
5. Pour 5 liters of cool water into the machine
through the Water Entrance (#4). Allow approximately
two minutes between each carafe to flow into the
tank.
6. Allow the water to flow into the pot or server, wait
approximately 5 minutes after the water stops
flowing.
7. Discard the water in the pot or server and replace it
on the base or the Lower Hot Plate.
8. The brewer is now ready for use.
9. Plug the power cord into the power outlet and turn
power switch to the "ON" position, the brewer will
begin heating.
10.When the "Ready to Brew" indicator lights up, the
machine is ready for use.
CAUTION
: Hot Surface.
Содержание CBS-2
Страница 7: ...C B S 2 V E R 8 1 1...
Страница 8: ...C B S 2 V E R 8 1 1...