Table 7: Commissioning record tables - flasher head 12 to 22
Flasher head
12
13
15
15
16
17
18
19
20
21
22
Equipment cabinet
SW2 address
REIL/RTIL
FCU-3 / FCU-1
FCU-1 phase
connect
Termination
resistance set
P1/P3 to
P1/P3 to
Timing [ms]
Group
Table 8: Commissioning record tables - flasher head 23 to 32
Flasher head
23
24
25
26
27
28
29
30
31
32
Equipment cabinet
SW2 address
REIL/RTIL
FCU-3 / FCU-1
FCU-1 phase
connect
Termination
resistance set
P1/P3 to
P1/P3 to
Timing [ms]
Group
4.6.3 J-bus settings table (option)
Hardware present Bus A
Bus B
Arbiter
Arbiter
Local kill
Local kill
Default
Breakdown mode
Default mode
Default step
Default step REIL
Flashing System Maintenance
Commissioning
30
Copyright
©
ADB Safegate, All Rights Reserved
Содержание FCU-1-in-1
Страница 2: ......
Страница 8: ...Flashing System Maintenance TABLE OF CONTENTS viii Copyright ADB Safegate All Rights Reserved ...
Страница 18: ...Flashing System Maintenance Safety 8 Copyright ADB Safegate All Rights Reserved ...
Страница 23: ...3 2 2 FCU 3 UM 4019_AM02 620e Rev 3 0 2020 05 12 13 Copyright ADB Safegate All Rights Reserved ...
Страница 28: ...Flashing System Maintenance Introduction 18 Copyright ADB Safegate All Rights Reserved ...
Страница 42: ...Flashing System Maintenance Commissioning 32 Copyright ADB Safegate All Rights Reserved ...
Страница 64: ...Flashing System Maintenance Maintenance 54 Copyright ADB Safegate All Rights Reserved ...
Страница 74: ...Flashing System Maintenance Checks and measurements 64 Copyright ADB Safegate All Rights Reserved ...
Страница 102: ...FCU 3 Flashing System Maintenance PCB drawings and settings 92 Copyright ADB Safegate All Rights Reserved ...
Страница 106: ...Flashing System Maintenance Technical data 96 Copyright ADB Safegate All Rights Reserved ...
Страница 110: ......