5-2
DuraStor 412R/6320SS/7320SS Installation and User’s Guide
Front Bezel
The front bezel (
) houses the status LEDs, drive LEDs,
and alarm reset button. When the front bezel is removed, you can
access the disk drives. The front bezel can be installed or removed
without interruption to current system activities.
Embedded within the front bezel is the electronic package that
provides the communication with the microprocessor. The
microprocessor communicates with the RAID controllers, SAF-TE
Environmental Processors (SEPs), and the disk drives in the storage
subsystem. It passes that information to the front bezel channel
mode and drive status LEDs, and the Disk Array Administrator
firmware-based software.
Power is applied to the front bezel through an edge connector,
where a control circuit monitors the bezel for proper connection.
When the bezel is properly installed and power is applied to the
storage subsystem, the bezel is immediately energized.
Figure 5-1 Removable Front Bezel
For instructions on removing and replacing the front bezel, see
Drive Activity LEDs
Status LEDs
Alarm Reset Button
DuraStor IUG - Online.book Page 2 Friday, July 19, 2002 3:06 PM