
Clean the boiler on a regular base
.
An expert should be entrusted with the mounting of the heating and the initial operation.
This must be a person who will take over the responsibility and guarantee the correct operation of the
boiler and of the complete central heating system. In the case of an incorrectly planned system with
manifesting deficiencies caused by the respective person’s incorrect installation of the system, which can
again lead to an incorrect operation of the boiler, the complete liability for the material damage and
potential new costs arising in relation to it is borne exclusively by the person who was entrusted with
the mounting of the central heating system, and not by the boiler manufacturer, sales representative or
seller.
While in use, some parts of the boiler may be hot. Don’t touch the boiler without appropriate
hand protection against heat.
If some parts of the boiler occur to be damaged it is strictly forbidden to continue using the
boiler.
Do not touch electrical wires with wet hands
Electric connections must be made according to 73/23 CEE i 93/98 CEE and properly di-
mensioned.
4
Boiler placement
4.1
Boiler room
Boiler room must posess ventilation windows. The area for necessary ventilation surface is defined
like this:
A
(
cm
2
) = 6
,
02
·
P
(
KW
)
where P is nominal boiler power KW.
TOBY was designed to occupy minimum space. Connections for flue and water lines are on
lateral sides of the boiler allowing the boiler to be leaned on wall almost completely.
6
Содержание TOBY 20 KW
Страница 3: ...1 Boiler data 2...