CHECKS BEFORE STARTING UP
•
Check that the safety valves (DHW and primary) are correctly installed and that the outlets are
connected to the sewer.
• Check that the DHW tank and the primary circuit are filled with water.
• Check that the air has been correctly bled from both circuits.
• Check that the tank’s upper air bleed valve is tight.
• Check that the water side and heat source side pipes are correctly connected and not leaking.
STARTING UP
To put the installation into service, refer to the heating boiler manual.
en
20
Smart Green
: A1002064 - 661Y3000 • B
EN
NL
ES
IT
DE
PL
RU
FR
STARTING UP
STARTING UP PROCEDURE
As the Smart Green tank is used within a heating system:
To put the heating system into service, refer to the heating boiler manual.
1.
Adjust the required temperature using the control thermostat.
Содержание SMART 130 GREEN
Страница 5: ...en 5 Smart Green A1002064 661Y3000 B EN FR NL ES IT DE PL RU PRODUCT INFORMATION ENERGY LABELLING...
Страница 6: ...en 6 Smart Green A1002064 661Y3000 B EN NL ES IT DE PL RU FR PRODUCT INFORMATION RATING PLATE...
Страница 24: ...en 24 Smart Green A1002064 661Y3000 B EN NL ES IT DE PL RU FR...