![ACV HeatMaster 120 TC Скачать руководство пользователя страница 55](http://html1.mh-extra.com/html/acv/heatmaster-120-tc/heatmaster-120-tc_installation-operation-and-maintenance-instructions_3047123055.webp)
HeatMaster 25 C: A1003474 - 664Y7000 • B
EN
FR
NL
ES
IT
DE
PL
RU
en
41
MAINTENANCE
TORQUE VALUES
Tightening torque
(Nm)
Description
Min.
Max
Burner flange screws
5
6
Electrode screws
3
3.5
Venturi screws
3.5
4
Gas valve screws
3.5
4
CLEANING THE EXCHANGER
Set-up conditions
•
Boiler shut down
•
External power supply isolated
•
Gas supply closed
•
Burner removed i.a.w. procedure “Removal and Installation of the Burner” on page 40.
•
Front and top panels removed, refer to “Removal and Installation of the Front and Top Panels” on
page 32.
Procedure
1.
Brush and vacuum clean the chamber.
2.
Pour some water in the chamber to flush away any foreign deposits that may be present in the heat
exchanger.
3.
Remove and clean the condensate trap.
4.
Reinstall the condensate trap, refer to “Boiler preparation” on page 30.
Follow-on tasks
1.
Reinstall the burner according to procedure “Removal and Installation of the Burner” on page 40.
2.
Restart the boiler in accordance with procedure “Restarting after Maintenance” on page 41.
RESTARTING AFTER MAINTENANCE
Set-up conditions
•
All removed components reinstalled
•
All connections made
•
Power supply
•
Gas supply open
•
Hydraulic circuit(s) full of water
Procedure
1.
Make sure there is no gas leak at the gas connections.
2.
Switch the appliance on using the ON/OFF master switch.
3.
Set the appliance at maximum power and check the absence of gas leaks.
4.
Check the gas pressure and CO
2
adjustment in accordance with “Checking and Adjusting the Burn-
er” on page 37.
Follow-on tasks
None