Compact Condens : A1003043 - 664Y7200 • A
EN
FR
NL
ES
IT
DE
PL
RU
en
11
INSTALLER’S GUIDE
BOILER SETUP GUIDE FOR THE INSTALLER
The parameters of the Compact Condens boilers can be set up by the installer using the Technician setup
function of the controller. It allows the installer to setup extensively the appliance according to the system
configuration.
Accessing the Installer menu
- Press the “
menu”
key from the green keypad to access the screen shown
below. Then type the Installer code “
231
” using the red keys corresponding to the “+” and “-” signs on the
display..
Press this key to
access the Installer
menu
esc
ok
menu
eco
Insert code
To select
to confirm
ok
Press the corresponding red
keys to reach the desired value
for the selected number. Then
press the “
ok
” key to go to the
next position.
The following parameters can be accessed by the installer.
1. ADVANCED CH SETTINGS
2. ADVANCED DHW SETTINGS
3. SYSTEM SETTINGS
4. DIAGNOSTICS
5. USER SETTINGS
6. RESTORE FACTORY SETTINGS
See the following pages for more details.
Start up process
During heat demand the pump is activated by the controller. After zero-check of the air pressure switch
the fan speeds up to airflow-check fan speed. Once the air pressure switch is closed the fan goes to igni-
tion fan speed.
After 5 seconds pre-purge on ignition fan speed, the water pressure sensor, gas pressure switch and si-
phon pressure switch are checked. When all pressure switches are closed and the water pressure is OK,
the ignition is released.
The temperature control and safeguarding is done with the use of NTC’s. Data coming from these NTC’s is
processed by the controller (Maxsys) that takes care of control and safe-guarding of the boiler.
“Slow start” principle
Standard setting of the boiler involves the “slow start” principle in order to avoid the boiler and installa-
tion to heat up too quickly.
After “zero check” APS and closure APS with pre purge, ignition starts. After a stabilizations time the boiler
modulates down to low capacity and stays there for 1 minute. Subsequently the boiler speeds up at a
rate of 4 °C/min till set capacity or set temperature has been reached. Once heat demand has finished the
boiler will stop after its set pre-purge period.
Press the corresponding red
keys to get back to the user/in-
staller selection screen.
esc
ok
menu
eco
USER
TECHNICIAN