FILLING THE DHW TANK (Figure 1)
General remark
•
Connect the safety valve outlet to the sewer.
1.
To fill the tank, open a hot water tap (
2
) located at the highest point of the system. It enables
to bleed the air from the system.
2.
Open the filling valve (
1
) and the stop valves (
3
) to fill the DHW tank.
3.
Close the hot water tap (
2
), after the water flow has stabilised and the air has been
completely evacuated.
4.
Check all the connections of the system for leaks.
FILLING THE PRIMARY CIRCUIT (Figure 2)
General remark
•
If the tank is used within a heating system, refer to the heating boiler manual.
1.
Check that the drain valve (
3
) of your primary circuit is tightly closed.
2.
Open the stop valves (
1
) and (
2
) of the primary circuit connected to the heating boiler.
3.
Open the air bleed valve (
4
) located on the top of the hot water tank.
4.
When the air is eliminated, close the air bleed valve (
4
). Make sure the air bleed valve is tight.
FILLING
Essential instruction for the correct operation of the system
•
The DHW tank must always be filled and pressurised before filling and pressurising
the primary circuit.
FILLING THE DHW TANK (Figure 1)
General remark
•
Connect the safety valve outlet to the sewer.
1.
To fill the tank, open a hot water tap (
2
) located at the highest point of the system. It enables
to bleed the air from the system.
2.
Open the filling valve (
1
) and the stop valves (
3
) to fill the DHW tank.
3.
Close the hot water tap (
2
), after the water flow has stabilised and the air has been
completely evacuated.
4.
Check all the connections of the system for leaks.
FILLING THE PRIMARY CIRCUIT (Figure 2)
General remark
•
If the tank is used within a heating system, refer to the heating boiler manual.
1.
Check that the drain valve (
3
) of your primary circuit is tightly closed.
2.
Open the stop valves (
1
) and (
2
) of the primary circuit connected to the heating boiler.
3.
Open the air bleed valve (
4
) located on the top of the hot water tank.
4.
When the air is eliminated, close the air bleed valve (
4
). Make sure the air bleed valve is tight.
FILLING
Essential instruction for the correct operation of the system
•
The DHW tank must always be filled and pressurised before filling and pressurising
the primary circuit.
en
22
Comfort E
: A1002860 - 661Y1600 • D
EN
NL
ES
IT
DE
PL
RU
FR
STARTING UP
Содержание Comfort E 100
Страница 5: ...en 5 Comfort E A1002860 661Y1600 D EN FR NL ES IT DE PL RU PRODUCT INFORMATION ENERGY LABELLING ...
Страница 6: ...en 6 Comfort E A1002860 661Y1600 D EN NL ES IT DE PL RU FR PRODUCT INFORMATION RATING PLATE ...
Страница 17: ...en 17 Comfort E A1002860 661Y1600 D EN FR NL ES IT DE PL RU INSTALLATION TANK POSITION ...
Страница 30: ...en 30 Comfort E A1002860 661Y1600 D EN NL ES IT DE PL RU FR ...