14
S002102 6 Station Swing Set
Assembly Instructions (cont)
Step 6
Anchoring the Swing Set to the ground
Important: For safety reasons this swing set MUST be anchored into the ground.
To carry out this procedure, you must hammer the included pegs into the ground
Attach the swing to the pegs at the connection points shown below. We highly
recommend these anchor pegs be concreted, but this is optional. However if
the ground is soft and the peg can easily be pulled out by hand once installed,
concreting is essential. Contact our service centre for more information.
Once assembly is completed, carefully check equipment. In the unlikely event that you do
any
problems, please contact us. DO NOT allow children to use this product until the problem has been
corrected.
48
48
3 11
47
47