DOC 02110-1
ACTIA PCs
Page 19 / 52
INSTALLATION
Cautions
- This system is designed for negative ground 12V
or 24V
operation only.
- To avoid IHMI v2 damage, remove the battery power before connecting (or disconnecting) the mixing
panel connector. This can be done by removing the PDB fuse.
In this configuration, the IHMI v2 is automatically powered up when the vehicle ignition is switched on. When
the ignition is switched off (for more than 10 seconds), the operating system is notified in order to shut down
properly. After shutdown, the IHMI v2 is powered down.
Note: If the system does not shut down within 10 minutes (standard profile or 45 minutes with aggressive
profile or 4 hours with relax profile) after the ignition was switched off, power down is forced to preserve
battery life.
If IHMI v2 cables are not fully installed, the antenna cables, the mixing panel and Ethernet cables and the
cable cover must be set following the next 3 paragraphs.
Содержание IHMI
Страница 1: ...DOC 02110 revision 1 ACTIA PCs IHMI v2 USER S MANUAL ...
Страница 42: ...DOC 02110 1 ACTIA PCs Page 42 52 Module MC75i EDGE World 2 2 ...
Страница 43: ...DOC 02110 1 ACTIA PCs Page 43 52 Module PHS8 3G World 1 2 ...
Страница 45: ...DOC 02110 1 ACTIA PCs Page 45 52 Module SparkLan WPEA 121N ...
Страница 48: ...DOC 02110 1 ACTIA PCs Page 48 52 APPENDICES Mechanical drawings IHMI v2 case ...
Страница 49: ...DOC 02110 1 ACTIA PCs Page 49 52 IHMI v2 with back plastic cover Round base ball dashboard fixing ...
Страница 52: ...DOC 02110 1 ACTIA PCs Page 52 52 NOTES ...