Actavo BoSS SOLO 700 Скачать руководство пользователя страница 4

www

.

ac

t

a

vo.

c

o

m

BoSS SOLO

700

 USER GUIDE

Safety First

TIES

Ties should be used 

w

hen the to

w

er goes beyond its s

a

fe

height, beyond the li

m

its of the st

a

bilisers/outriggers or if

there is 

a

 d

a

nger of inst

a

bility. They should be rigid, t

w

wa

y

ties f

a

stened to both uprights of the fr

am

w

ith lo

a

d-be

a

ring

right 

a

ngled or s

w

ivel 

c

ouplers. Only 

c

ouplers suit

a

ble for the

50.8

mm

 di

am

eter tube of the to

w

er should be used. Ide

a

lly,

ties should be se

c

ured to both f

ac

es of 

a

 solid stru

c

ture by

m

e

a

ns of 

a

n

c

hor

a

ges.

The tie frequen

c

ma

y v

a

ry depending on the 

a

ppli

ca

tion, but

they should (

a

a

 

m

ini

m

u

m

) be every 4 

m

etres in height.

For further infor

ma

tion on tying-in 

a

 to

w

er ple

a

se 

c

ont

ac

t your

supplier or BoSS.

MAINTENANCE - STORAGE -
TRANSPORT

All 

c

o

m

ponents 

a

nd their p

a

rts should be regul

a

rly inspe

c

ted

to identify d

ama

ge; p

a

rti

c

ul

a

rly to joints. Lost or broken p

a

rts

should be repl

ac

ed, 

a

nd 

a

ny tubing 

w

ith indent

a

tion gre

a

ter

th

a

n 5

mm

 should not be used 

a

nd put to one side for

ma

nuf

ac

ture rep

a

ir. Adjust

a

ble leg thre

a

ds should be 

c

le

a

ned

a

nd lightly lubri

ca

ted to keep the

m

 free running.

Br

ac

c

l

aw

s, fr

am

e interlo

c

c

lips, tr

a

pdoor l

a

t

c

hes 

a

nd

pl

a

tfor

m

 

w

indlo

c

ks should be regul

a

rly 

c

he

c

ked to ensure they

lo

c

c

orre

c

tly.

Co

m

ponents should be stored 

w

ith due 

ca

re to prevent

d

ama

ge.

Ensure 

c

o

m

ponents 

a

re not d

ama

ged by ex

c

essive str

a

pping

for

c

es 

w

hen tr

a

nsported.

Safety First

FREEPHONE: 0800 214 005

Содержание BoSS SOLO 700

Страница 1: ...www actavo com BoSS SOLO700 One Man Aluminium Tower 3T Through the Trapdoor Method...

Страница 2: ...ES The BoSS Clima aluminium system has been tested and certi ed to EN 1004 2004 Class 3 Instruction Manual EN 1298 IM EN PREPARATION AND INSPECTION Inspect the equipment before use to ensure that it i...

Страница 3: ...and set the adjustable legs as required Do not move the tower in wind speeds over 7 7 metres per second 17mph Safety First DURING USE Beware of high winds in exposed gusty or medium breeze conditions...

Страница 4: ...very 4 metres in height For further information on tying in a tower please contact your supplier or BoSS MAINTENANCE STORAGE TRANSPORT All components and their parts should be regularly inspected to i...

Страница 5: ...DE FREEPHONE 0800 214 005 Ensure all brace claws cam locks and adjustable legs operate correctly Ensure castors rotate freely and brakes lock Re inspect the tower every seven days or less Quantity Sch...

Страница 6: ...s and for storage of materials EN 1004 requires platforms at least every 4 2m and these measures will exceed that requirement If the tower is to be used with two people SP10 s stabaliser must be tted...

Страница 7: ...t a single person can safely build the platform tower to a platform height of 4 2m 1 Insert castor into adjustable leg apply brake by pushing the lever down release frame interlock clips and t the leg...

Страница 8: ...h rung from base level Step 3 Engage Cam Locks as shown to lock guardrail unit in position Assembly Procedure Fit stabilisers to tower before extending telescopic leg Position top clamp above rung 6 s...

Страница 9: ...and 4th rung above the platform deck Repeat with second Cam Lock guardrail frame on the front of tower to fully secure platform Engage and lock Cam Lock claws Do not climb onto the platform until it i...

Страница 10: ...Assembly Procedure 12 Place the trapdoor deck onto the 16th rung of the wer and engage windlocks Climb the end frame from within and from the protected trap door position t the Cam Lock Guardrails as...

Страница 11: ...atform Move Assembly Brackets to base of the tower and t to the lowest rungs of the end frames Dismantling Procedure 14 Simply follow the assembly steps in reverse ensure that the 3T method is followe...

Страница 12: ...on the inside of the folding base unit end frames Assembly Procedure 3 Place the Cam lock frames 3 at either end within the trolley Ensure the diagonal struts of the Camlock frames t between the arms...

Страница 13: ...e St Michaels Close Aylesford ME20 7XE Tel 01622 794 450 kent hire actavo com East London Bow Unit 3 Primrose Works 10 Stour Road Bow London E3 2NT Tel 0208 533 7333 bow hire actavo com South London S...

Отзывы: