60
Warning
Disconnect from Main Supply before Servicing the air conditioner
The unit is designed to give a long life operation with minimum maintenance required. However, it should be
regularly checked and the following items should be given due attention.
Components
Maintenance Procedure
Recommended Schedule
Air Filters
1. Clean with a vacuum cleaner, or by tapping lightly
and then washing in lukewarm water (below 40°C)
With neutral soap.
2. Rinse well to dry before re-installing.
3. Note : Never use petrol, thinner, benzene or any
other chemicals.
Every 2 weeks.
More frequently if required.
Indoor Unit
1. Clean away dirt or dust on grille or panel by wiping
with a soft cloth soaked in lukewarm (or cold)
water or neutral detergent solution.
2. Note: Never use petrol, thinner, benzene or any
other volatile chemicals, which may cause
plastic surface to deform.
Every 2 weeks.
More frequently if required.
Condensate Drain
Pan & Pipe
1. Check and clean.
Every 3 months.
Indoor Fan
1. Check for unusual noise.
As necessary.
Indoor/Outdoor Coil
1. Check and remove dirt which are clogged between
fins.
2. Check and remove obstacles which hinder air flow
in and out of indoor/outdoor unit.
Every month.
Every month.
Electrical
1. Check voltage, current and wiring.
2. Check faulty contacts caused by loose connections,
foreign matters, etc.
Every 2 months.
Every 2 months.
Compressor
1. No maintenance needed if refrigerant circuit
remains sealed. However, check for refrigerant leak
at joints & fittings.
Every 6 months.
Compressor
Lubrication
1. Oil is factory charged. Not necessary to add oil if
circuit remains sealed.
No maintenance required.
Fan Motors
Lubrication
1. All motors pre-lubricated and sealed at factory.
No maintenance required.
PRE-START UP MAINTENANCE (AFTER EXTENDED SHUTDOWN)
-
Inspect thoroughly and clean indoor and outdoor units.
-
Clean or replace air filters.
-
Clean condensate drain line.
-
Clean clogged indoor and outdoor coils.
-
Check fan imbalance before operation.
-
Tighten all wiring connections and panels.
-
Check for refrigerant leakage.
13. SERVICING AND MAINTENANCE
Содержание ACC 10 C/CR
Страница 16: ...15 MODEL ACC50C MODEL ACC60C...
Страница 20: ...19 MODEL ALC 30 40 50 60 C CR A4LC 30 40 50 C CR Note Dimension in mm MODEL AMC 60 C CR Note Dimension in mm...
Страница 25: ...24 MODEL ACC 40C 50C ALC A4LC 40C 50C FOR LOCAL SPEC MODEL ACC 60C ALC 60C FOR EXPORT SPEC WITH MC SLM C3 0BCC...
Страница 26: ...25 MODEL ACC 60 ALC 60C FOR EXPORT SPEC WITH MC MODEL ACC 60C ALC 60C FOR LOCAL SPEC...
Страница 27: ...26 MODEL ACC 60C AMC 60C FOR EXPORT SPEC WITH SLM CONTROL C3 0BCC...
Страница 28: ...27 MODEL ACC 10CR 15CR ALC A4LC 10BR 15BR...
Страница 29: ...28 MODEL ACC 20CR 25CR ALC A4LC 20BR 25BR...
Страница 30: ...29 MODEL ACC 30CR ALC A4LC 30CR...
Страница 31: ...30 MODEL ACC 40CR 50CR ALC A4LC 40CR 50CR...
Страница 32: ...31 MODEL ACC 60CR ALC 60CR...
Страница 33: ...32 MODEL ACC 60CR AMC 60CR FOR EXPORT SPEC WITH SLM CONTROL C3 0BCC...
Страница 37: ...36 MODEL ACC 60C AMC 60C FOR EXPORT SPEC WITH SLM CONTROL U1 4...
Страница 38: ...37 MODEL ACC 10 15CR ALC A4LC 10 15BR FOR EXPORT SPEC WITH SLM CONTROL U1 4...
Страница 39: ...38 MODEL ACC 20 25CR ALC A4LC 20 25BR FOR EXPORT SPEC WITH SLM CONTROL U1 4...
Страница 40: ...39 MODEL ACC 30CR ALC A4LC 30CR FOR EXPORT SPEC WITH SLM CONTROL U1 4...
Страница 41: ...40 MODEL ACC 40 50CR ALC A4LC 40 50CR FOR EXPORT SPEC WITH SLM CONTROL U1 4...
Страница 42: ...41 MODEL ACC 60CR ALC 60CR FOR EXPORT SPEC WITH SLM CONTROL U1 4...
Страница 43: ...42 MODEL ACC 60CR AMC 60CR FOR EXPORT SPEC WITH SLM CONTROL U1 4...
Страница 46: ...45 MODEL ALC 20 25BR HEAT PUMP 3 PHASE 50HZ 380 415V MODEL ALC 30CR HEAT PUMP 3 PHASE 50HZ 380 415V...
Страница 49: ...48 LOW AMBIENT UNIT OPTIONAL OUTDOOR UNIT MODEL ALC 10B 15B 50HZ OUTDOOR UNIT MODEL ALC 20B 25B 50HZ...