Figure 1.4 - Pipework Configuration for A5CM2020ER 

 

 

Pipe sizes for the A5CM20ER are 1/4” Liquid & 1/2” Gas 

 

Pipe Sizes for the A5LC40CR are 3/8” Liquid & 5/8” Gas 

 

 

A5CM20ER 

Cassette 

Master Unit

 

A5CM20ER 

Cassette 

Slave Unit 

5/8” Gas

3/8” Liquid 

1/2” Gas 

1/4” 
Liquid 

1/2” Gas 

C/U 

NOTES: 

1.

 

A reducing Tee is 
necessary where 
pipework is split 
between each 
cassette on 

BOTH

 

Liquid and Gas 
Lines. 

2.

 

The distance from 
the tee to each 
indoor unit 

MUST

 

be more or less 
equal to prevent 
liquid flooding one 
of the cassettes and 
starving the other. 

Содержание A5CM2020ER

Страница 1: ...Multisplit Installation Manual Model Reference A5CM2020ER ...

Страница 2: ...ld be 240v 1ph with a 5amp motor rated fuse supply Power to outdoor unit should be 420v 3ph with a 25amp per phase fuse supply b Interconnecting and Control Cables From Outdoor Unit to Indoor Master Unit 3 Core Master Unit to Slave Unit control using 2 off Nim Boards and One off Netware Controller Slave Unit Outdoor Fan Sensor connection on PCB fitted with resistor c Wiring Configuration See Figur...

Страница 3: ... connect it to CN4 on the slave unit indoor pcb Address the Slave unit as follows 6 Dip Switch marked DSW1 eight switches LEAVE ALL SWITCHES DOWN OFF 7 Dip Switch marked DSW2 four switches LEAVE SWITCH 1 2 3 SET DOWN OFF MOVE SWITCH 4 UP ON This unit is now addressed as the slave unit number 1 Connect the Nim Boards together as follows 8 Connect a two core cable of about 75mm to CN3 on the Master ...

Страница 4: ...E 3ph Power Feed E L L1 N L2 1ph Power Feed 4WV Comp OF OF A 4 WV Comp N L E L L1 N L2 1ph Power Feed 4WV Comp OF E Field Wiring NOT USED NOT USED NOTES 1 Nim PCB and Netware setup are as per normal Master Slave wiring configuration 2 OD Coil Sensor on SLAVE UNIT is linked out with the resistor 4 7Kohm supplied ...

Страница 5: ...nsure that the high pressure switch remains operational when using the A5LC40CR in a multisplit application Carry out the modification on site as follows 1 Remove Blue Wire from contactor at point A2 and Mains Neutral Terminal and discard 2 Remove Black High Pressure Switch Wire from Terminal A and re connect directly to point A2 on the contactor ...

Страница 6: ... ensure that the high pressure switch remains operational when using the A5LC40CR in a multisplit application Carry out the modification on site as follows 1 Remove Blue Wire from contactor at point A2 and Mains Neutral Terminal and discard 2 Remove Black High Pressure Switch Wire from Terminal A and re connect directly to point A2 on the contactor ...

Страница 7: ...0ER Cassette Master Unit A5CM20ER Cassette Slave Unit 5 8 Gas 3 8 Liquid 1 2 Gas 1 4 Liquid 1 2 Gas C U NOTES 1 A reducing Tee is necessary where pipework is split between each cassette on BOTH Liquid and Gas Lines 2 The distance from the tee to each indoor unit MUST be more or less equal to prevent liquid flooding one of the cassettes and starving the other ...