Ai C20 RECIRCULATING CHILLER USER’S MANUAL
15
10.2
Inspection
10.2.1
Every 3 – 6 months, qualified personnel should inspect the unit and keep any records of it maintenance for any City,
State, or Federal Inspector.
10.2.2
Service Technician - equipment being serviced should at least be shut down for 4 hours prior to the Service Technician
arriving.
10.2.3
Product specific risks that may affect service personnel:
10.2.3.1
Glass being broken - Use caution and proper gloves to handle broken glass.
10.2.3.2
Using Antistatic Gloves and or Grounding yourself is important so you won’t get shocked.
10.2.4
Verification of the safe sate of the equipment after repair:
10.2.4.1
Visual inspections of the unit is the first thing that will need to be done. Make sure that everything is
adjusted or cleaned.
10.2.4.2
Testing the unit to see if all the repairs have worked is the form of verification.