AcraDyne HT series Скачать руководство пользователя страница 6

6

Operation

A complete tool system consists of the following items:

Controller

Power cord

Tool

Tool Cable

Reaction Bar*

* Application specific

Clutched Models

An optional feature on AcraDyne

® 

HT Series Nutrunners is a locking clutch that allows the gearcase 270 degrees of rotation in 

relation to the motor/handle assembly.  This feature is useful in positioning the reaction bar against the workpiece prior to the 
tightening event.  

CAUTION IS REQUIRED. THE CLUTCH PIN SHOULD BE FULLY ENGAGED BEFORE COMMENCING 
TIGHTENING OPERATION.  THE GEARCASE HAS STOPS THAT LIMIT ROTATION TO APPROXIMATELY 
270 DEGREES AND SHOULD NOT BE ROTATED PAST ITS STOPS AS SERIOUS DAMAGE CAN OCCUR 
WITHIN THE TOOL.

To maximize the effectiveness of this feature:

 

•  Begin with the AcraDyne

® 

HT Series Nutrunner 

                  disconnected from any controller.

 

•  Make sure the recessed area around the teeth on the 

 

  Reaction Bar is down toward the Gear Box.

 

•  Install the Reaction Bar by lining up the Set Screw on the

 

  front of the Gear Box with the Notch in the Reaction Bar.

 

•  Install the Retaining Ring into the Groove of the Gear Box.

 

•  Reconnect the AcraDyne

®

 HT Series Nutrunner to an 

 

 AcraDyne

®

 Controller and prepare for use.

WARNING: FOR MODELS THAT DO NOT HAVE THE NOTCH AND SETSCREW:
THE REACTION BAR MUST BE INSTALLED CENTERED IN THE GEARCASE. THIS PROCESS 

 

MUST BE FOLLOWED TO ENSURE THE REACTION BAR IS CENTERED IN THE ROTATION OF THE GEARCASE.

THE TOOL HANDLE MUST NOT BE LOCATED AGAINST A SOLID OBJECT DURING OPERATION OF 
THE TOOL WITHOUT A REACTION BAR OR REACTION ABSORBING DEVICE IN USE AND IN GOOD 
CONDITION.  A PINCH POINT CAN EXIST BETWEEN THE HANDLE AND THE SOLID OBJECT AND 
WILL RESULT IN DAMAGE TO THE TOOL, SEVERE INJURY OR DEATH SHOULD PROPER REACTION 
HANDLING PRACTICES NOT BE OBSERVED.

When ready to begin tightening:
 

•   Pull the Spring Loaded Clutch Knob away from the tool body.

 

•  Swivel the reaction bar into position minimizing or ideally eliminating any gap 

 

  between the Reaction Bar and the Reaction Surface of the application.

 

•  Release the Spring Loaded Clutch Knob and the clutch will lock the 

 

  position prior to tightening.

 

•  Complete the tightening event.

Reaction Bar

Set Screw

Retaining Ring

Notch

Gear Box

Clutch Knob

Содержание HT series

Страница 1: ...AcraDyne High Torque Nutrunners Operations Manual PO Box 16460 Portland OR 97292 0460 800 852 1368 Fax 800 582 9015 www aimco global com...

Страница 2: ...Table of Contents Introduction 3 Safety Information 3 Specifications 4 Operation 5 6 Reaction Bars Safety 7 8 Accessories 9 Recommended Maintenance 10 AIMCO Limited Warranty 11 2...

Страница 3: ...lt in serious personal injury b Use safety equipment Always wear eye protection Safety equipment such as dust mask non skid safety shoes hard hat or hearing protection used for appropriate conditions...

Страница 4: ...responsible for the setup of these options Tool Speeds should be set taking into consideration the maximum RPM output of the given tool in use Tools with Maximum Rated RPM below 30 should not be ran...

Страница 5: ...B again will switch the tool back to FWD mode and will indicate this with no LED lights turned on CAUTION IS REQUIRED FAILURE TO EXERCISE CAUTION AND CORRECT OPERATING TECHNIQUE CAN RESULT IN SERIOUS...

Страница 6: ...the Notch in the Reaction Bar Install the Retaining Ring into the Groove of the Gear Box Reconnect the AcraDyne HT Series Nutrunner to an AcraDyne Controller and prepare for use WARNING FOR MODELS TH...

Страница 7: ...OR DEATH The guidelines offered below are only guidelines Should there be any doubt as to the integrity of a proposed reaction strategy it is strongly advised to consult with an AcraDyne authorized re...

Страница 8: ...to press against an object to counteract Torque Reaction as the tool is delivering Torque THE OPERATOR MUST TAKE GREAT CARE TO KEEP BODY PARTS OR FOREIGN MATTER CLEAR OF THE AREA BETWEEN THE REACTION...

Страница 9: ...ail Hoist 8000 Series 25497 Rear fixed hoist ring 8000 Series 25289 Fixed hoist handle not included 8000 Series 25280 Auxiliary Handle 8000 Series SWIVEL HANDLE SWIVEL BAIL HOIST RING FIXED HANDLE WIT...

Страница 10: ...rvice Center The tool gear train should be cleaned inspected and re greased every 25 000 tightening cycles Parts should be inspected for wear and any worn parts should be replaced In addition to this...

Страница 11: ...s option any products which are returned freight prepaid to AIMCO and which AIMCO determines to be defective as described above or at AIMCO s option refunding the purchase price of such products AIMCO...

Страница 12: ...UARTERS 10000 S E Pine St Ave Crist bal Colon 14529 Portland OR 97216 Chihuahua Chihuahua 31125 Mexico 800 852 1368 52 614 380 1010 FAX 800 582 9015 FAX 52 614 380 1019 LIT MAN165 Rev 02 14 Printed in...

Отзывы: