July 2020 |
Page
13
NSW/WA/SA/ACT
02 8708 4400
VIC/TAS
03 8773 5300
QLD/NT
07 3442 6200
www.
acprod
.com.au
Product & Installation Manual: MAX-Tension
TM
TL-2
Step 1 - Post Assembly and Installation
Item #
Part #
Description
Qty
4
MAXP1G
MAXTENSION POST 1 1830MM GALV
1
11
MAXLPG
MAXTENSION LINE POST 1830MM
4
The MAX-Tension™ TL-2 guardrail end terminal is designed to attach to 787mm W-beam guardrail
systems. If the existing rail system is not 787mm in height, ensure the guardrail end terminal is
properly transitioned per Federal, State, and Local standards.
1.1 Install posts (items 11 & 4) in the configuration shown. Ensure post height and post spacing
follow the dimensions above.
NOTE:
Slot on post 1 (item 4) is facing upstream.
NOTE:
The spacing between post 3 and post 4 is unique.
NOTE:
The spacing between post 1 and post 2 is unique.
NOTE:
The detail above depicts a tangent system without an offset. If applying an allowable offset
of 0-610mm, modify the post offsets accordingly.
Содержание MAX-Tension TL-2
Страница 32: ......
Страница 33: ......
Страница 34: ...GA TR09 AUSTRALIAN CONSTRUCTION PRODUCTS ACP ...
Страница 35: ...GA TR12 AUSTRALIAN CONSTRUCTION PRODUCTS ACP ...