background image

Revised A: 10/24/22

Page 9 of 18

Part #: 6216-011-000

INSTALLATION, OPERATION 

& MAINTENANCE MANUAL

 NEO-METRO FIELD SERVICE

TOLL FREE

 800-743-8259 • 

LOCAL

  626-855-4866 • 

FAX

 626-855-4863

PUSH-IN FITTING INSTALLATION

NOTE: FITTINGS AND TUBE SHOULD BE KEPT 
CLEAN, BAGGED AND UNDAMAGED PRIOR TO 
INSTALLATION.

3. Pull on the fitted tubing to ensure it is secure. Tube 

should not come free from the fitting. Water test the 
connection assembly prior to leaving the site to ensure 
there are no leaks.

4.  To disconnect the tube from the fitting ensure that the 

water line is depressurized. Push collet square towards 
the push-in fitting body and hold. While holding the 
collet in, pull on the PE tubing to remove from the push-
in fitting. 

1.  Cut to fit length of 1/4” PE tubing and remove any burrs 

or sharp edges. Ensure that the outside diameter is free 
from score marks. Tube ends should be square.

2.   Firmly and fully insert the tubing end into the push-in 

fitting up to the tube stop located approximately 1/2” 
deep.

1.

2.

3.

4.

SPOUT INSTALLATION

1.   Assemble spout to deck securing it with nut.
2.  Connect 1/4” O.D. PE tubing from valve to Union 

Push-In Connection.  

COLLET

COLLET

O-RING

O-RING

TUBE STOP

COLLET

COLLET

COLLET

Washer

Ø1/4" OD

PE Tubing

Push-In

Connection

Nut

Содержание NEO-METRO SLAB-EDGE 3802

Страница 1: ...riate Tools Part 6216 011 000 Revised A 10 24 22 Page 1 of 18 TABLE OF CONTENTS Prior to Installation 2 Accessibility Comparison 3 Dimensional Data 4 Rough Ins 5 Installation 6 12 Finished Layouts 13...

Страница 2: ...bly T P Mixing Valve Assembly Recommended working water pressure is 30 PSI 2 07 bars minimum to 100 PSI 6 89 bars maximum Maximum hot water temperature is 180 F 82 C Temperature adjustment range is 95...

Страница 3: ...33 4 34 RIM MAX 27 17 9 22 33 4 31 RIM MAX 27 17 9 22 33 4 17 9 34 RIM MAX 22 33 4 34 RIM MAX 17 9 ADA PROFILE CBC PROFILE OBC PROFILE ADA PROFILE OBC Ontario Building Code CBC California Building Cod...

Страница 4: ...DIMENSIONAL DATA 56 22 17 Revised A 10 24 22 Page 4 of 18 Part 6216 011 000 INSTALLATION OPERATION MAINTENANCE MANUAL NEO METRO FIELD SERVICE TOLL FREE 800 743 8259 LOCAL 626 855 4866 FAX 626 855 4863...

Страница 5: ...all Anchoring 9 16 Mounting Hole Support Bracket Mounting 2 Places I Wall Anchoring 3 8 x 3 4 Long Trap Cover Mounting Slots 2 Places J Supply Stub Out with Stop for Valve 1 2 NPSM Tempered Supply Inl...

Страница 6: ...tional MC Mounting Carrier plus consideration for fixture Water Supply and Waste Piping 261 4 667 251 2 648 7 177 181 2 470 6 152 6 152 A 4 102 FINISHED FLOOR 61 2 165 4 102 23 4 70 4 102 SQ 4X 9 16 1...

Страница 7: ...wall using 1 2 mounting hardware supplied by others Assemble deck to P Trap enclosure using the 1 4 20 hardware 2provided 6 places 1 4 20 UNC X 1 2 HEX HEAD CAP SCREW PROVIDED 1 4 MOUNTING BOLTS PROVI...

Страница 8: ...Assemble waste piping using teflon tape on all 5threaded connections and make up waste connections to 1 1 2 P Trap HINT Teflon tape is recommended on all threaded waste and supply connections NOTE ADD...

Страница 9: ...ng ensure that the water line is depressurized Push collet square towards the push in fitting body and hold While holding the collet in pull on the PE tubing to remove from the push in fitting 1 Cut t...

Страница 10: ...water temperature at outlet If water is not at desired temperature adjust as necessary 1 Loosen locknut 2 Turn on fixture and run water for at least 2 minutes Allow supply temperature to stabilize 3 T...

Страница 11: ...per tubing connection Timing Screw To adjust timing turn timing screw HAND OPERATION CONNECTIONS Turn timing screw clockwise to increase timing Do not over tighten ferrule nuts Revised A 10 24 22 Page...

Страница 12: ...to soap filler assembly and soap reservoir with provided hose clamps C Install soap dispenser s onto deck NOTE Gasket and Washer are located beneath the deck D Attach 3 8 O D Tubing to the dispenser...

Страница 13: ...HED LAYOUTS SHOWN FOR REFERENCE Revised A 10 24 22 Page 13 of 18 Part 6216 011 000 INSTALLATION OPERATION MAINTENANCE MANUAL NEO METRO FIELD SERVICE TOLL FREE 800 743 8259 LOCAL 626 855 4866 FAX 626 8...

Страница 14: ...lean with scale remover solution or pressurized air Debris or scale in diaphragm Remove diaphragm and clean Sensor flashes once when user s hands are within range Remove strainer and clean CONDITION F...

Страница 15: ...riser tubing is crimped Straighten valve riser tubing Debris or scale in checkstop strainer Remove checkstop strainer and clean Blockage in valve flow control Remove blockage Low water pressure at su...

Страница 16: ...h polishing surfaces RECOMMENDED CLEANING MATERIALS Sponge natural or artificial Nylon or other soft bristle material brush Soft cloth as used on automobile finishes RECOMMENDED CLEANING SOLUTIONS Han...

Страница 17: ...1070 Mixing Valve Assembly 2598 202 001 2598 302 001 Description Part No Diagram SO VALVE AND SPOUT DETAILS 3802 SO Binho Industrial Sensor Operated Spout 9VDC provided with Power Supply and Battery P...

Страница 18: ...ap Waste Assembly 4970 040 003 Trap Enclosure 6216 200 002 ENCLOSURES NEO METRO FIELD SERVICE TOLL FREE 800 743 8259 LOCAL 626 855 4866 FAX 626 855 4863 PDM SOAP OPTION Soap Filler Assembly 1391 008 0...

Отзывы: