![Acorn Safety S0310-FPB Скачать руководство пользователя страница 2](http://html1.mh-extra.com/html/acorn-safety/s0310-fpb/s0310-fpb_installation-operation-and-maintenance-instructions_2839781002.webp)
Acorn Safety
a division of Acorn Engineering Company
™
Manual #7109-214-001
ROUGH-IN
1. Read the installation instructions prior to beginning the installation.
2. Separate parts from packaging and verify all necessary parts are accounted for and undamaged. Obtain missing or
damaged parts from Acorn Safety prior to beginning installation.
3. Flush water supply lines prior to installation. This will remove unwanted debris from the lines and prevent unwanted
blockages in the safety equipment.
4. In order to comply with ANSI Z358.1, the safety equipment must be inspected periodically. An inspection tag is
provided for documentation purposes.
5. all employees at risk of contamination should be informed and trained in the use of this and any other safety
equipment. The signage provided should be posted appropriately in close proximity to this equipment.
Installation & Operation Manual
PRELIMINARY STEPS
31
1
2
"
[800]
8"
[203]
11
1
2
"
[292]
1-1/4" NPT
WASTE
BURY DEPTH
SEE NOTE 2
3/4" NPT
FEMALE SUPPLY
BLEED HOLE
OUTLET
FREEZE RESISTANT
VALVE
GENERAL NOTES:
ALL DIMENSIONS ARE IN INCHES [MM].
STANDARD DEPTHS ARE 24, 36 AND
48 INCHES. OTHERS AVAILABLE
UPON REQUEST.
1.
2.
NOT LESS THAN 3 CUBIC FT.
OR POROUS FILL AROUND AND
BELOW BLEED OUTLET FOR
DRAINAGE. DO NOT USE SAND.
Ø7
1
2
"
[191]
Ø
3
8
"
[10]
Ø9
1
8
"
[232]
S0310-FPB24 SHOWN FOR
REFERENCE
FLANGE MOUNTING
DETAIL
Date: 10/28/2013
Page 2 of 7