
Calibration
Page 91
5.
Back -
Pressure Calibration Menu
- (read note) - OK.
5.3
Pressure Calibration (Internal Pump Option Only)
The internal pump requires a separate pressure calibration procedure that replaces the one used in
Section 5.2.
Note:
Ensure that the instrument has been running for at least one hour before any calibration is
performed to ensure sufficient stability.
Note:
Ensure units of measure are the same on both the barometer and instrument.
Equipment Required
Barometer
Procedure
1.
Disconnect any external tubing connected to the rear ports of the instrument.
2.
Open -
Main Menu
Calibration Menu
Pressure Calibration
- (read displayed note) - OK.
Note:
This action will place the valve sequence on hold; normal sampling will be interrupted.
3.
Edit -
Vacuum Set Pt.
- (Read displayed instructions) - OK.
4.
Connect a barometer to the
Sample Port
(refer to Figure 5).
5.
Wait 2-5 minutes and ensure the pressure reading on the barometer has dropped and is stable.
6.
Enter the barometer reading into the instrument - Accept.
7.
Read displayed instructions - OK.
8.
The pump should now stop automatically. Disconnect the barometer from the
Sample Port
.
9.
Wait 2-5 minutes and enter the ambient barometer reading into the instrument - Accept.
Note:
Both of the pressure sensors should now be displaying the current ambient pressure and they
should be the same value within 3 torr of each other.
10.
Back -
Pressure Calibration Menu
- (read note) - OK.
5.4
Zero Calibration
Zero precision checks and calibrations are used to determine the zero response of the instrument
and set the offset of the instrument if required.
Содержание Met One Instruments GAS-1060
Страница 10: ...Serinus 60 User Manual 3 0 Page 10 This page is intentionally blank...
Страница 18: ...Serinus 60 User Manual 3 0 Page 18 This page is intentionally blank...
Страница 35: ...Installation Page 35 Figure 7 Switching the Battery On Off...
Страница 36: ...Serinus 60 User Manual 3 0 Page 36 This page is intentionally blank...
Страница 102: ...Serinus 60 User Manual 3 0 Page 102 This page is intentionally blank...
Страница 122: ...Serinus 60 User Manual 3 0 Page 122 7 6 USB Memory Stick Failure Figure 64 USB Memory Stick Failure...
Страница 134: ...Serinus 60 User Manual 3 0 Page 134 9 5 Plumbing Schematic PN D020060...
Страница 135: ...Parts List Page 135 9 6 Block Wiring Schematic PN D020111...
Страница 136: ...Serinus 60 User Manual 3 0 Page 136 9 7 Measurement Cell Side Section PN H015000...
Страница 137: ...Parts List Page 137...
Страница 138: ...Serinus 60 User Manual 3 0 Page 138 9 8 Calibration Valve Manifold Assembly Exploded View PN H010013 01...
Страница 139: ...Parts List Page 139 9 9 Valve Assembly Exploded View PN H010042...
Страница 140: ...Serinus 60 User Manual 3 0 Page 140 9 10 High Pressure Valve Exploded View PN H050043...