Acmeda PIUMA Скачать руководство пользователя страница 4

 

Page

 

2.1

 

piuma

 

Installation

 

Manual

 

|

 

December

 

2014

 

©

 

Copyright

 

2014

 

|

 

All

 

Rights

 

Reserved

 

Acmeda

 

(International

 

Group)

 

 

SECTION

 

2

 

− 

INSTALLATION

 

 

STEP

 

1

 

 

DEFINE

 

BRACKET

 

POSITION

 

Define

 

the

 

distance

 

of

 

the

 

wall/ceiling

 

brackets

 

and

 

position

 

them

 

on

 

the

 

wall

 

                                                                                        

 

STEP

 

2

 

 

ATTACH

 

AWNING

 

TO

 

BRACKETS

 

Insert

 

the

 

square

 

bar

 

(A)

 

to

 

the

 

wall/ceiling

 

brackets

 

(B)

 

positioned

 

previously.

 

Check

 

distance

 

required

 

to

 

install

 

square

 

bar

 

to

 

brackets

 

(Fig

 

1.1

 

&

 

1.2)

 

 

 

 

 

STEP

 

3

 

 

TEST

 

AWNING

 

After

 

having

 

checked

 

the

 

tightness

 

of

 

the

 

front

 

terminal

 

bar

 

connecting

 

screws,

 

remove

 

the

 

safety

 

bands

 

and

 

straps

 

from

 

the

 

arms

 

and

 

open

 

the

 

awning.

 

Fix

 

the

 

fabric

 

to

 

the

 

terminal

 

bar

 

to

 

prevent

 

is

 

from

 

sliding.

 

Use

 

screws

 

between

 

the

 

spline

 

and

 

the

 

extrusion.

 

Open

 

and

 

close

 

the

 

awning

 

twice.

 

 

 

IMPORTANT

 

Ensure

 

that

 

there

 

are

 

no

 

persons,

 

animals

 

or

 

things

 

in

 

the

 

vicinity

 

while

 

opening/closing

 

the

 

awning.

 

 

 

Содержание PIUMA

Страница 1: ...PIUMA INSTALLATION MANUAL December 2014 ...

Страница 2: ...staller is responsible to ensure that the devises used to anchor the product to the supporting structure are suitable for the application SAFETY INFORMATION Ensure Job Safety Analysis Safe Work Method Statement is completed and actions to reduce risks are implemented Ensure that electrical works are done only by a LICENSED ELECTRICIAN DO NOT modify any of the components of this system PERSONNEL RE...

Страница 3: ...vers are required Jaw Pliers detail if any alternate pliers are required Scissors Stapler Punch tool template Measuring Tape Pencil Etc ADDITIONAL ITEMS REQUIRED NOT SUPPLIED To assemble a piuma the following non stocked items are required Staples specify size if applicable Fabric Spline Specify spline sizes and type Screw Specify screw type head type size length and material Rivet Specify head ty...

Страница 4: ... brackets B positioned previously Check distance required to install square bar to brackets Fig 1 1 1 2 STEP 3 TEST AWNING After having checked the tightness of the front terminal bar connecting screws remove the safety bands and straps from the arms and open the awning Fix the fabric to the terminal bar to prevent is from sliding Use screws between the spline and the extrusion Open and close the ...

Страница 5: ...re are no persons animals or things in the vicinity while opening closing the awning I Slacken the side screw A of the folding arm support using and allen key 10 II To increase the inclination slacken the socket head screw B using allen key 8 III To decrease the inclination tighten the socket head screw raising the front terminal bar After regulation check that the front terminal bar is perfectly ...

Страница 6: ...s Reserved Acmeda International Group SECTION 4 REMOVING THE AWNING The awning must be taken down by qualified personnel The awning must be taken down when closed I Remove the screws from the brackets that lock the square bar in place and remove the awning from the brackets ...

Отзывы: