![ACME Poly-tunnel Скачать руководство пользователя страница 5](http://html1.mh-extra.com/html/acme/poly-tunnel/poly-tunnel_assembly-manual_458483005.webp)
V. Assembly Instructions
A) Preparing the site
1.
Clear the area from vegetation and
debris.
2.
Level the ground if necessary.
3.
Outline
the rectangular footprint of the
greenhouse with 4 sticks connected by
string.
B) Assembling the frame
1.
Place ground pegs
(
a
) inside the string every
1.47m on the long sides and at each corners.
2.
Drive the pegs into the ground
using a
sledgehammer. Cushion each peg's head with a
piece of timber so it does not get distorted. Leave
20cm (8") of the peg stick out so the stopping
screw is just above ground level.
3.
Before
assembling the hoops
, verify that the end of each half hoop (
b
)
slides onto its respective ground peg. File the tubes if they do not fit.
4.
Join each half hoop pair with a cross clamp
(
i
) on the
ground.
5.
Mount the first 2 hoops
on the ground pegs.
6.
Install a ridge bar
(
c
) between the 2 first hoops.
Attach the extremities of the ridge bar onto the
hoops with a cross clamp (
i
), filleted tips facing down.
7.
Mount the next hoop
and connect it to the previous
one with a ridge bar.
Repeat until all 11 hoops are
assembled
.
8.
Place Q-clips
(
j
)
on the end-hoop
and on the extremities of a prop bar
(
d
).
©Acme Polytunnels-2018
of
5
8
5.8m
15m
To ensure the corners form 90º angles, move the opposite stakes so the diagonals are the
same length.
c
i
a
b