+140
TEMPERATURE TEST OF BOARD AND ELECTRONIC SUB-ASSEMBLIES : RELIABILITY TEST
60’
120’
T
E
M
P
E
R
A
T
U
R
E
+90
+20
20’
160’
TIME
100
200
+20
300
STOP
60’
400
500
600
700
800
900
1000
H
U
M
I
D
I
T
Y
-25
free H
drying
H libre
OFF
ON
OFF
P
O
W
E
R
DURATION OF FIRST PHASE = 180 minutes
COLD , POWER ON PERMANENTLY
DURATION OF SECOND PHASE = 180 minutes
HOT , POWER ON PERMANENTLY
END
FINAL
TEMPERATURE = 20 C
PAGE 6-3
Содержание MI400 Series
Страница 2: ......
Страница 6: ...NOTES ...
Страница 16: ...NOTES ...
Страница 17: ...SECTION 2 MI400 Series MI400 RKMI400 MI400 24V ...
Страница 18: ...NOTES ...
Страница 29: ...SECTION 3 MI400 RTS Series MI400 RTS MI400 24V RTS RKMI400 RTS ...
Страница 30: ...NOTES ...
Страница 40: ...NOTES ...
Страница 41: ...SECTION 4 MI400 400 Series MI400 400 ...
Страница 42: ...NOTES ...
Страница 47: ...SECTION 5 Assembly Examples With FIXING PLATE RDMI RKMI ...
Страница 48: ...NOTES ...
Страница 54: ...NOTES ...
Страница 55: ...SECTION 6 Temperature Tests ...
Страница 56: ...NOTES ...
Страница 60: ...NOTES ...
Страница 61: ...APPENDIX A Distribution Signals ...
Страница 62: ...NOTES ...
Страница 65: ...APPENDIX B Troubleshooting ...
Страница 66: ...NOTES ...
Страница 69: ...APPENDIX C Extract from EIA standard Cable length ...
Страница 70: ...NOTES ...
Страница 78: ......
Страница 79: ......