background image

2

3

4

5

5

5

5

7

7

3

3

4

4

4

L03A

L03B

L02A

L03A

L03B

L03B

L02A

L02A

L02A

Z01

S01

M01

6

6

6

Stage 2

Ridge brackets (L03A) and Eave brackets (L03B) are to be placed 300mm from the end of each 

IMPORTANT!

Pay attention to this small hole which 

should face up and to the right side.

Greenhouse ridge and eave profile. Drill 8 holes through L03A into the ridge frame and also drill 8 
holes through L03B into the gutter/eave profile (refer to figures shown).

At the base of the Greenhouse place a W01 300mm from the front of the Greenhouse and place another at 1725mm. 
Predrill the holes using a 6mm diameter drill and screw fix the brackets in place being careful not to over tighten. Repeat 

the process on the opposite side of Greenhouse.

Ensure the shading material 

does not rub on the screw heads.

2

NO. Qty.

PART

4

S01

M6X10

8

L02A

L03B

L03A

W01

W02

W03

W04

4

4

4

4

M01

M6

8

6

Z02

Ø

4X16

3

8

Z01

Ø

5X16

W05

5

W06

4

W01

7

Содержание Grow More Shade Net Kit 6.5'

Страница 1: ...Assembly Instructions Customer Support Support ACFgreenhouses com 1 888 888 9050 Model Shade Net Kit 6 5 Item No 2532100 ...

Страница 2: ...efully before assembling Please keep these instructions for future reference PARTS LIST Tools Required Screwdriver Drill Spanner 2 NO Qty PART 4 L02A L03B L03A W01 W02 W03 W04 4 4 4 4 3 S01 M6X10 8 M01 M6 8 6 Z02 Ø4X16 8 Z01 Ø5X16 W05 5 NO Qty PART W06 4 J01 10 ...

Страница 3: ...1A L01A L01A L02A L02A Y1 L02A Y1 Stage 1 Each section of shading kit is in 2m modules see page 4 for installation of additional modules Insert L01A into the hem of the shading material Insert into the channel of L02A ...

Страница 4: ...rame and also drill 8 holes through L03B into the gutter eave profile refer to figures shown At the base of the Greenhouse place a W01 300mm from the front of the Greenhouse and place another at 1725mm Predrill the holes using a 6mm diameter drill and screw fix the brackets in place being careful not to over tighten Repeat the process on the opposite side of Greenhouse Ensure the shading material ...

Страница 5: ... up and to the right side Insert the W02 part into L02A at each end of the shading rod Then assemble the rope and spring tensioner to hold the shade cloth firmly in place It is important the shading material is taut over the Greenhouse Repeat the process on the opposite side of Greenhouse W04 W03 W01 W06 ...

Страница 6: ... ridge frame and also drill 8 holes through L03B into the gutter eave profile refer to figures shown At the base of the Greenhouse place a W01 300mm from the back of the Greenhouse and place another at 1725mm Predrill the holes using a 6mm diameter drill and screw fix the brackets in place being careful not to over tighten Repeat the process on the opposite side of Greenhouse Ensure the screws Z02...

Страница 7: ...d spring tensioner to hold the shade cloth firmly in place It is important the shading material is taut over the Greenhouse Repeat the process on the opposite side of Greenhouse PLEASE NOTE If your Grange Greenhouse exceeds 4mL and requires additional 2mL Shading modules the W05 joiners are not provided It is only necessary to join each 4m section 18 19 17 18 19 20 20 20 J01 20 20 20 20 20 20 W04 ...

Отзывы: