2
3
4
5
5
5
5
7
7
3
3
4
4
4
L03A
L03B
L02A
L03A
L03B
L03B
L02A
L02A
L02A
Z01
S01
M01
6
6
6
Stage 2
Ridge brackets (L03A) and Eave brackets (L03B) are to be placed 300mm from the end of each
IMPORTANT!
Pay attention to this small hole which
should face up and to the right side.
Greenhouse ridge and eave profile. Drill 8 holes through L03A into the ridge frame and also drill 8
holes through L03B into the gutter/eave profile (refer to figures shown).
At the base of the Greenhouse place a W01 300mm from the front of the Greenhouse and place another at 1725mm.
Predrill the holes using a 6mm diameter drill and screw fix the brackets in place being careful not to over tighten. Repeat
the process on the opposite side of Greenhouse.
Ensure the shading material
does not rub on the screw heads.
2
NO. Qty.
PART
4
S01
M6X10
8
L02A
L03B
L03A
W01
W02
W03
W04
4
4
4
4
M01
M6
8
6
Z02
Ø
4X16
3
8
Z01
Ø
5X16
W05
5
W06
4
W01
7