Z10
L09
J06R/L
Z02
L30
1
2
3
4
1 1
1
1
2
4
1 1
1 1
4
4
3
3
31
J07
Install the L09 gutter profile over the edges of the panels,
ensuring the rubber strip seals against the panels.
Then fix into place with the Z10 screws, do not over tighten.
When installing the J07 and the second section of gutter,
it can help if you have 2 people, one guiding the gutter
into the J07 and the other gently tapping the end of the
gutter with a rubber mallet. It can help to install the J07
into one end of the gutter before hand.
L30
J93
L30
Z02
J92
To avoid leaking, using silicone
on J06R / L, L30 and J93
is an option (see Fig. above).
Drill one hole on both L01A & D
approx 500mm up from the bottom,
Dia. 2.5mm, then tighten J92 with
Z02, and push L30 into the channel
of J92 (see Fig. above).
QTY.
NO.
PART
J02
2
J06R/L
2/2
L30
4
J93
J92
4
4
J07
L09
4
16
Z10
Ø
5X30
2
24
Z02
Ø
4X16D