background image

                                                                       ACER XV272K V3 

 

 

 

4.  Assembly and Disassembly SOP

4.1 Disassembly Procedures 

Preparation before disassemble 
1. 

Clean the room for disassemble 

2. 

Identify the area for monitor 

3. Check the position that the monitors be placed and the quantity of the monitor ;prepare the area for 

material flow; according to the actual condition plan the disassemble layout 

4. 

Prepare the implement, equipment, materials as bellow: 

1) 

working table 

2) 

Screw-driver 

3) 

knife 

4) 

glove 

5) 

cleaning cloth 

6) 

ESD protection 

S1 

Disassemble the base, stand 

A.  Place the machine face down on the clean flat washers first 
B.  Remove the screw from the bracket and take off the base  
C.  Using the screw-driver to take the screw off and remove the 

stand from the monitor 

  

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

S2 

Disassemble the back cover  

A.  Remove the three screws of fixing back cover to shielding  
B.  Using the disassemble tool to unclench the back cover from 

bottom side to other three side   

C.  Remove the back cover and pull out the key board line and LED 

line by vertically 

 
 
 
 
 
 
 
 
 
 

Remove the three screws of 
fixing back cover to shielding   

Содержание XV272K V3

Страница 1: ...ACER XV272K V3 1 ACER_XV272K V3 _SM20230815V1 Acer Monitor XV272K V3 LIFECYCLE EXTENSION GUIDE...

Страница 2: ...agram 6 3 Mechanical Instruction 7 4 Assembly and Disassembly SOP 8 5 Troubleshooting 14 6 FRU List 16 Safety Notice Any person attempting to service this chassis must familiarize with the chassis and...

Страница 3: ...pairing method may damage equipment or products It is recommended that service engineers should have repairing knowledge experience as well as appropriate product training per new model before perform...

Страница 4: ...ACER XV272K V3 5 1 Exploded Diagram 1 1 Product Exploded Diagram 1 2 BOM LIST...

Страница 5: ...ACER XV272K V3 6 2 Wiring connectivity diagram...

Страница 6: ...he type and size of the tools that would typically can be used to disassemble the product to a point where components and materials requiring selective treatment can be removed Tool Description workin...

Страница 7: ...Screw driver 3 knife 4 glove 5 cleaning cloth 6 ESD protection S1 Disassemble the base stand A Place the machine face down on the clean flat washers first B Remove the screw from the bracket and take...

Страница 8: ...off S4 Remove the main board and power board and pull out the wire from board A Using the screw driver to remove the screw which fixing the main board and power board to shielding B Remove the main b...

Страница 9: ...ame on the panel S2 Assemble the mainboard and power board of shielding A Assemble LVDS wire Keypad wire and backlight wire on the mainboard B Assemble the power wire from mainboard to power board C P...

Страница 10: ...semble the LVDS line to panel with jig C Fix the shielding D Assemble the backlight to panel E Fixed backlight and speaker wire with tape Assemble right speaker Assemble left speaker Connect the wire...

Страница 11: ...d through bottom left right and top side S6 Loading back cover screw and assemble stand and base A Loading three back cover with screw driver B Assemble the stand into the back cover C Assemble the ba...

Страница 12: ...ACER XV272K V3 15 5 Troubleshooting...

Страница 13: ...tever reasons a part number change is made it will not be noted on the printed Service Guide For AUTHORIZED SERVICE PROVIDERS your office may have a DIFFERENT part number code from those given in the...

Отзывы: