- 25 -
Disassembly SOP
Preparation before disassemble
1. Clean the room for disassemble
2. Identify the area for monitor
3. Check the position that the monitors be placed and the quantity of the monitor; prepare the area for
material flow; according to the actual condition plan the disassemble layout
4. Prepare the implement, equipments, material as bellow:
1) Press-fixture
2) Working table
3) Screw-driver
4) Knife*1
5) Glove
6) Cleaning cloth
7) ESD protection
item
picture
Operation
Tool
Notes
1
Prize up the cover.
Unsharpness.
2
Disassemble the stand
4 screws
Screw-driver
:
7.5+0.5Kg*cm
Screw head:
#
2
3
Disassembly the bezel
from the monitor, notice
the disassembly order :
1.Left (1) parts of bezel
2.Top (2) parts of bezel
3.Bottom (3) parts of
bezel
4. Right (4) parts of
bezel
Don’t draw the BZL
When disassembly
the bezel ,notice
don’t bend the
C/B .man must wear
glove
The purpose is
loose the BZL
Содержание X193HQ Series
Страница 18: ... 18 3 9 Packing ...
Страница 34: ... 34 Note you can change program speed bar to meet your equipment speed if program firmware fail ...
Страница 39: ... 39 5 4 OSD Operation Guide OSD Function Requirements ...
Страница 40: ... 40 ...
Страница 41: ... 41 ...
Страница 42: ... 42 Remark Acer logo must be appeared while power on or suspend ...
Страница 51: ... 51 Appendix 2 Physical Dimension Front View and Side view Fig 1 Physical Dimension Front View and Side view ...
Страница 52: ... 52 Fig 2 Appearance Description ...
Страница 53: ... 53 Appendix 3 Control Board ...
Страница 54: ... 54 Appendix 4 Power Board ...
Страница 55: ... 55 ...
Страница 56: ... 56 Appendix 5 Interface Board ...
Страница 57: ... 57 ...
Страница 58: ... 58 ...