4.2 Assembly Procedures
Preparation before assemble:
1.Clean the room for work
2.Identify the area for material
3.
Prepare the implement, equipment, materials as bellow
:
1) working table
2) Screw-driver
3) Knife
4) glove
5) cleaning cloth
6) ESD protection
Step 1
Insert lamp wire & panel edp to the Main BD.
Connect LVDS to Main BD and Power BD
Step 2
Put the SHD on the worktable.
Locate Main BD and Power BD into the SHD.
Cover the mylar on Power BD
Lock 6 screws as the picture sequence.
Step 3
Assemble navi key and FFC LED to the PCBA key BD as the picture
1.
Assemble the key BD on rear cover.
Lock two screws to the rear cover as below pic 2.
Fix the wire of speaker by yellow tape as below pic 3.
Pic 1
S2
Assemble the MF and panel
Take the Panel on the sponge cushion.
Insert the little connector of the lamp wire to panel as the picture 1, thread the lamp
wire out of the hole of the MF. Assemble the MF onto the panel.
Lock 9 screws to the MF as the picture 2.
Insert the FFC wire to the Panel as the picture 3.
短的蓝色
补强板端
插按键板
长的蓝色补
强板端插主
板
Содержание VG272U
Страница 1: ...ACER Monitor_VG272U LIFECYCLE EXTENSION GUIDE ...
Страница 4: ...ACER VG272U 4 1 Exploded Diagram 1 1 Product Exploded Diagram ...
Страница 5: ...ACER VG272U 55 2 Wiring connectivity diagram ...
Страница 12: ......
Страница 13: ......
Страница 15: ...ACER B277 16 5 Troubleshooting ...
Страница 16: ...ACER B277 15 ...