ACER VG271U
10
4.2 Assembly Procedures
Preparation before assemble:
1.Clean the room for work
2.Identify the area for material
3.Prepare the implement, equipment, materials as bellow
:
1) working table
2)
Screw-driver: Philips-head screwdriver, Hex-head screwdriver
3) Knife
4) Glove
5) Cleaning cloth
6) ESD protection
After unplugging the power cord, the power board still have power energe. Please pay attention when
disassembling/assembling.
S1
Assemble I/F BD and P/BD
from SHD.
Before Disassembling & Assembling, monitor need to be put on the sponge and
the Insulation glove must be wore during the process.
Insert P/BD Wire to P/BD and assemble the P/BD to the SHD.
Insert the FFC LVDS and P/BD wire to the IF BD and assemble the IF BD to the SHD.
Lock all PCBA screws, 1 DP screw as picture 2.
Assemble the Mylar on the SHD as the picture 3.
PICTURE 1 PICTURE 2 PICTURE 3
S2
Assemble Panel to MF
Take the Panel
and insert lamp wire to panel marked as picture 1.
Assemble the MF to the panel and lock 9 screws to the MF as picture 2.
Stick 1 piece of adhesive tape on the little connector of lamp wire as picture 3.
PICTURE 1 PICTURE 2 PICTURE 3
P/BD
P/BD
I/F BD