61
Cable routing
Process:
1. Put master HDD Cable into HDD1 slot, And Put Slave HDD Cable into HDD2 slot
Remove Cables
Process:
1.
Remove Audio cable from M/B “F-AUDIO”
。
2.
Remove card reader cable from M/B “USB2”
3.
Remove USB1 cable from M/B “F_USB4”
4.
Remove USB2 cable from M/B “F_USB3”
5.
Remove recovery cable from M/B.
6.
Remove the
“
Intrusion” cable from M/B.
Содержание Veriton M420
Страница 13: ...7 Main board Placement...
Страница 14: ...8 Block Diagram...
Страница 38: ...32 Integrated Peripherals IDE Function Setup...
Страница 42: ...36 Integrated Peripherals Onboard I O Chip Setup...
Страница 47: ...41 PCI PnP Setup...
Страница 49: ...43 PC Health Status...
Страница 61: ...55 Veriton M220 Extensa E420...
Страница 80: ...74...
Страница 81: ...75...
Страница 83: ...77...
Страница 84: ...78...
Страница 85: ...79...
Страница 86: ...80...
Страница 87: ...81...