
Acer | HDS AMS200 User and Reference Guide
209
9.
Is the READY LED on the RKS (and RKNAS) on?
Yes: Continue to use the equipment in its current operational state . When the READY
LED (green) blinks continuously, it blinks for up to 15 minutes because the download of
the ENC/SENC firmware is executed. The subsystem is operational even though the
READY LED (green) is blinking.
No: Verify that READY LED does not turn on, or that READY LED has turned on once and
then turned off.
10.
Is the RKNAS connected?
Yes: If the POWER LED on the RKNAS does not light, set the AC power unit switch of the
RKNAS to off, and call the Engineer.
No: Go to step 11.
11.
End of the procedure.
8.1.2
The POWER LED Turned Off
When the POWER LED has turned off, follow these steps:
1.
Is electricity supplied to the equipment?
Yes: Go to step 2.
No: Supply electricity to the unit, and then restart the unit. Go to step 2.
2.
Verify that the AC cable is correctly connected to the plug socket.
3.
Set the main switch to off, then set all the AC power unit switches to off.
4.
After waiting for more than one minute, set all the AC power unit switches to on, then
set the main switch to on.
5.
Has the POWER LED on the RKS turned on?
Yes: Go to step 7.
No: Set the main switch to off, then set the AC power unit switch to off.
6.
Call your Customer Engineer. Go to step 9.
7.
Has the READY LED on the RKS turned on?
Yes: Continue to use the equipment in its current operational state . When the READY
LED (green) blinks continuously, it blinks for up to 15 minutes because the download of
the ENC/SENC firmware is executed. The subsystem is operational even though the
READY LED (green) is blinking, continue to use the equipment as it is.
No: Refer to section 8.1.3.
8.
Is the RKNAS connected?
Yes: If the POWER LED on the RKNAS does not light, set the AC power unit switch of the
RKNAS to off, and call your Customer Engineer.
No: Go to step 9.
9.
End of the procedure.
Содержание HDS AMS200
Страница 1: ...MK 95DF713 03 Acer HDS AMS200 User and Reference Guide ...
Страница 2: ......
Страница 6: ...vi Preface ...
Страница 9: ...Acer HDS AMS200 User and Reference Guide ix ...
Страница 10: ......
Страница 18: ...xviii Contents ...
Страница 28: ...8 Chapter 1 Overview of the AMS200 Subsystem ...
Страница 112: ...92 Chapter 4 Subsystem Architecture and Components ...
Страница 128: ...108 Chapter 5 Functional and Operational Characteristics ...
Страница 142: ...122 Chapter 6 Configuring the AMS200 Subsystem ...
Страница 148: ...128 Chapter 7 Configuring Storage on the Thunder 9530 V Series Subsystem Figure 7 1 Fibre Channel Setting ...
Страница 160: ...140 Chapter 7 Configuring Storage on the Thunder 9530 V Series Subsystem Figure 7 6 RAID Group is Updated NAS ...
Страница 220: ...200 Chapter 7 Configuring Storage on the Thunder 9530 V Series Subsystem Ð ...
Страница 223: ...Acer HDS AMS200 User and Reference Guide 203 Note When the NAS OS stops or is not installed click the Cancel button Ð ...
Страница 224: ...204 Chapter 7 Configuring Storage on the Thunder 9530 V Series Subsystem ...
Страница 227: ...Acer HDS AMS200 User and Reference Guide 207 ...
Страница 248: ...228 Chapter 8 Troubleshooting Figure 8 11 NNC Information Screen ...
Страница 292: ...272 Chapter 9 Periodic Maintenance ...
Страница 294: ...274 Chapter 9 Periodic Maintenance ...
Страница 300: ...280 Appendix B System Parameter Settings List ...
Страница 328: ...308 Appendix D Interfaces ...